Construction Manager Decision Delayed for New Fire Station Project
The Manhattan Fire Protection District has postponed a decision on hiring a construction management company for its new fire station project while fee structures are finalized.
Board members met with several potential construction managers to oversee the project, reviewing fees and discussing general conditions for the work. Attorney John Motylinski told the board that using a construction manager is common practice and has worked well for other fire departments.
“When this project goes out to bid, using a construction manager could result in savings overall,” according to the meeting minutes. Construction managers are bonded and insured, providing additional protection for the project.
The board tabled the decision until fee structures are determined. The delay does not affect the project timeline, as construction documents are nearing completion and the district still expects to open bids in mid-April.
Chief Malone reported that outdoor lighting and landscaping plans for the new station have been completed, and the final draft of all construction documents should be available soon. The district continues to meet weekly with engineers and architects to advance the project toward the planned June or July groundbreaking.
The new station represents a significant expansion of the district’s capabilities following the Manhattan-Peotone consolidation.
Community Events
Latest News Stories
Illinois business group warns of ‘backbreaking’ progressive income tax
Illinois tops U.S. in pumpkin production despite recent decline in value
Congress moves to restore federal union powers, critics warn of higher costs
Ukraine agrees to preliminary peace plan; Russian strikes continue
Illinois quick hits: Chiropractor sentenced for fraud; fatal airport shooting investigation
Trump administration ends protected status for Burmese nationals
Lincoln-Way 210 Receives Clean Audit, Financial Profile Score Downgraded to ‘Review’
Committee Grants Lenox Solar Farm Project Six-Month Variance Extension
Trump designates Muslim Brotherhood as foreign terrorist organization
Speed Limits Lowered in Green Garden and Frankfort Neighborhoods
Engineering Firm Hired for Gougar Road Bridge Replacement
Unpermitted Log Cabin and Stage Prompt Rezoning in Beecher