Manhattan awards $1.9M contract for Eastern Avenue rebuild
The Village of Manhattan Board approved a $1.94 million contract with PT Ferrell Construction for the reconstruction of Eastern Avenue from North Street to Smith Road during their July 1 meeting.
The project, which received unanimous board approval, will completely rebuild the deteriorated roadway with a four-foot shoulder and improved drainage. Village Administrator Justin Young explained the road has minimal base material beneath the asphalt, necessitating total reconstruction rather than resurfacing.
“There’s really no base there,” Young told the board. “There’s just like asphalt and like an inch of gravel. So that’s why it’s a total reconstruction.”
The project cost came in under the village’s original $2.5 million budget. Combined with a separate $420,000 culvert installation, the total Eastern Avenue improvements will cost approximately $2.36 million.
Construction will include installation of box culverts, guard rails, and resurfacing, with completion expected to take several months depending on weather conditions. The project will require road closures with detours using US Route 52 and North Street, though local traffic will be maintained.
Engineer representatives from Robinson Engineering explained they conducted soil borings and pavement analysis to minimize unexpected costs during construction. “We prefer to put as many bid items in there for what-if situations as possible to get them competitively bid as opposed to a change order on the back end,” the engineer told the board.
The Metropolitan railroad will handle track-related improvements separately, planning to switch from asphalt to concrete around the railroad crossing to reduce future maintenance issues.
Trustee discussions focused on ensuring the project stays within budget and addressing the road’s deteriorating condition, which board members noted has worsened significantly since the project was initially planned last year.
The village expects PT Ferrell to begin work following a pre-construction meeting, with some specialized components requiring a six-week manufacturing period before installation can proceed.
Latest News Stories
Envelopes with white powder sent to two Texas ICE offices, no public threat
Georgia GOP thanks Greene; Trump says she ‘went bad’
Texas governor, members of Congress lead effort to ban Sharia law in US
California loses one taxpayer per minute, Florida gains
Manhattan Appoints Rosemaria DiBenedetto as New Village Administrator
Manhattan School Board Honors Top Student-Athletes and Academic Achievers
Meeting Summary and Briefs: Will County Board Executive Committee for November 13, 2025
SCOTUS issues stay in Texas redistricting case
Marjorie Taylor Greene leaving Congress in January
WATCH: Trump, Mamdani meeting cordial with leaders finding common ground
Study: K-12 public spending nears $1 trillion in U.S.
WATCH: Power grid regulator says PNW in ‘crosshairs’ for potential winter blackouts