Manhattan awards $1.9M contract for Eastern Avenue rebuild
The Village of Manhattan Board approved a $1.94 million contract with PT Ferrell Construction for the reconstruction of Eastern Avenue from North Street to Smith Road during their July 1 meeting.
The project, which received unanimous board approval, will completely rebuild the deteriorated roadway with a four-foot shoulder and improved drainage. Village Administrator Justin Young explained the road has minimal base material beneath the asphalt, necessitating total reconstruction rather than resurfacing.
“There’s really no base there,” Young told the board. “There’s just like asphalt and like an inch of gravel. So that’s why it’s a total reconstruction.”
The project cost came in under the village’s original $2.5 million budget. Combined with a separate $420,000 culvert installation, the total Eastern Avenue improvements will cost approximately $2.36 million.
Construction will include installation of box culverts, guard rails, and resurfacing, with completion expected to take several months depending on weather conditions. The project will require road closures with detours using US Route 52 and North Street, though local traffic will be maintained.
Engineer representatives from Robinson Engineering explained they conducted soil borings and pavement analysis to minimize unexpected costs during construction. “We prefer to put as many bid items in there for what-if situations as possible to get them competitively bid as opposed to a change order on the back end,” the engineer told the board.
The Metropolitan railroad will handle track-related improvements separately, planning to switch from asphalt to concrete around the railroad crossing to reduce future maintenance issues.
Trustee discussions focused on ensuring the project stays within budget and addressing the road’s deteriorating condition, which board members noted has worsened significantly since the project was initially planned last year.
The village expects PT Ferrell to begin work following a pre-construction meeting, with some specialized components requiring a six-week manufacturing period before installation can proceed.
Latest News Stories
JJC Board Meeting Highlights Tensions Over Legal Bills, Trustee Conduct
Students, Trustees Emphasize Importance of Inclusivity and Flag Raisings at JJC
L-W School Board June 26 Meeting Briefs
JJC Embarks on New 10-15 Year Facilities Master Plan Process
Meeting Summary: Joliet Junior College Board of Trustees for June 25, 2025
Will County Board Halts Transportation Plan After Contentious 143rd Street Debate
Will County Board Upholds Zoning Denials, Rejecting Developer Appeals
Split Vote Halts Monee Truck Terminal Project
Future Quarry Fight Looms as Board Approves ‘Tequila Barrel’ Retreat
News Briefs from the Will County Board June 18 Meeting
Manhattan Police Department Welcomes New Full-Time Officer
Village Approves New Truck Purchase for Public Works Department