Manhattan School District 114 Logo Graphic

Manhattan District Adopts New Math Program After Comprehensive Review

Spread the love

The Manhattan School District 114 Board of Education unanimously approved the adoption of Eureka Math Squared for kindergarten through eighth grade on Tuesday, concluding a year-long evaluation process involving 25 teachers and extensive community feedback.

The decision came after curriculum committee members piloted two math programs—Eureka Math Squared and Envision—for five weeks each during the spring semester. Cheryl Donovan, the district’s curriculum director, presented the recommendation to the board following comprehensive feedback collection from teachers, students, and parents.

“The people in this room are the masters behind their craft,” Donovan told the board, referring to the teaching staff present at the meeting. “By having a common resource we can provide our kids with consistency from K-8, alignment, challenge and support in their daily lessons, engagement for our staff and our students, and strong communication home with our families.”

The evaluation process included multiple feedback mechanisms: parent and student surveys, optional meetings for pilot teachers, collaborative staff platforms, and detailed evaluation surveys comparing both resources to current practices. According to Donovan’s presentation, Eureka Math Squared outperformed Envision in eight of 13 curriculum areas, four of five assessment categories, and received higher confidence ratings from teachers for implementation.

Parent survey results showed similar positive responses for both programs, with over 75 percent of parents reporting their children’s attitudes toward math either stayed the same or improved. Students rated both resources favorably on lesson and assessment components, with narrative comments providing constructive feedback on strengths and areas for improvement.

The staff evaluation revealed that Eureka Math Squared aligned more strongly with four of the district’s five instructional priorities and generated more identified strengths with fewer barriers than Envision. Teachers particularly noted Eureka’s student-centered approach, though they acknowledged it would require adaptation to new instructional methods emphasizing math discourse and student engagement.

“Eureka prides itself on being accessible for all kids, having an entry point to math, being teachable for our teachers—it was written by teachers for teachers—and being engaging,” Donovan explained to the board.

The first-year implementation will include professional development and support for staff, teacher manuals, student workbooks with online access, and classroom manipulatives. The board approved the fiscal year 2026 costs, with discussions planned for potential multi-year pricing through the finance committee.

Board member Brian Anderson thanked the participating teachers for their commitment to the pilot process. “Being a curriculum guy in my school, I understand the time and effort that it takes,” Anderson said. “The time and effort is out of your normal routine to implement two different things, and the conversations that [we’ve] been having have been amazing.”

The new math program represents a significant investment in curriculum consistency across the district’s four buildings, addressing what administrators identified as a need for aligned mathematical instruction from elementary through junior high levels.

The adoption follows the district’s practice of comprehensive program evaluation, ensuring new resources meet both educational standards and the specific needs of Manhattan students and families.

Latest News Stories

Will County Board Graphic.04

Behavioral Health Division Drops Wait Times, Reports Zero Opioid Deaths in February

Public Health & Safety Committee Meeting | March 5, 2026 Article Summary: Will County’s Behavioral Health Division reported significant operational improvements, including a near-elimination of wait times for therapy and...

Meeting Summary and Briefs: Village of Manhattan for March 3, 2026

Village of Manhattan Meeting | March 3, 2026 The Manhattan Village Board met on Tuesday, March 3, 2026, to address village operations and listen to community concerns. The board heard...
Will County Board Graphic.03

Harris Drive Residents Plead for County Intervention Amid Failing Septic Systems and Flooding

Public Health & Safety Committee Meeting | March 5, 2026 Article Summary: Residents of Harris Drive appealed to the Public Health and Safety Committee for help with severe seasonal flooding...
Screenshot 2026-03-29 at 4.35.20 PM

Manhattan Village Board Approves Public Works Hires and Wastewater Equipment Purchase

Village of Manhattan Meeting | March 3, 2026 Article Summary: The Manhattan Village Board finalized the hiring of two full-time Public Works maintenance laborers and authorized the purchase of a new...
Police Crime

Will County Sheriff’s Office Investigates Fatal Hit-and-Run in Homer Glen

Article Summary: The Will County Sheriff’s Office is seeking the public's assistance in identifying a driver involved in a fatal hit-and-run crash in Homer Glen that left a pedestrian dead....
will county Committee-Public Health & Safety.Graphic

Federal Funding Freezes Threaten Will County Public Health Programs Amid Ongoing Lawsuits

Public Health & Safety Committee Meeting | March 5, 2026 Article Summary: Will County health officials are bracing for potential service disruptions as they monitor multiple federal lawsuits surrounding frozen...
Screenshot 2026-03-29 at 4.35.20 PM

Manhattan Village Board Hears Pushback Against Massive Solar Farm and Industrial Expansion

Village of Manhattan Meeting | March 3, 2026 Article Summary: A grassroots leader warned the Manhattan Village Board about a massive proposed solar facility and looming industrialization, asking for local cooperation...
Will County Board Federal Agenda

Board Splits Along Party Lines to Approve 2026 Federal Legislative Agenda

Will County Board Meeting | February 19, 2026 Article Summary: The Will County Board adopted its 2026 Federal Legislative Agenda in a 10-9 vote, establishing the county's priorities for lobbying efforts...
Will County Board Graphic.01

Meeting Summary and Briefs: Will County Landfill Committee for February 10, 2026

Will County Landfill Committee Meeting | February 10, 2026 The Will County Landfill Committee met on Tuesday to address legal preparations for the upcoming landfill expansion and operational needs at...
Will County Board Graphic.03

Meeting Summary and Briefs: Will County Board for February 19, 2026

Will County Board Meeting | February 19, 2026 Meeting SummaryThe Will County Board meeting on Thursday, February 19, 2026, was marked by significant zoning decisions, including the unanimous rejection of...
Will County Board Graphic.04

Board Approves Joliet Township Clean Fill Facility Despite Environmental Objections

Will County Board Meeting | February 19, 2026 Article Summary: The Will County Board approved a map amendment and special use permit for a Clean Construction and Demolition Debris (CCDD) facility...
solar panels photovoltaics in solar farm

Will County Board Unanimously Rejects Controversial Solar Farm in Troy Township

Will County Board Meeting | February 19, 2026 Article Summary: The Will County Board unanimously rejected a special use permit for a commercial solar energy facility near Shorewood following strong opposition...
Will County Board Graphic.03

Committee Approves $740,000 Compressor to Boost RNG Plant Uptime

Will County Landfill Committee Meeting | February 10, 2026 Article Summary: The Landfill Committee approved the purchase of a fourth feed compressor for the Renewable Natural Gas (RNG) facility to...
Meeting Briefs

Meeting Summary and Briefs: Lincoln-Way District 210 Board of Education for February 19, 2026

Lincoln-Way District 210 Board of Education Meeting | February 19, 2026 NEW LENOX – The Lincoln-Way Community High School District 210 Board of Education met on Thursday, February 19, 2026, to...
Will County Board Graphic.04

County Approves $1.9 Million for Wilmington-Peotone Road Engineering

Will County Board Meeting | February 19, 2026 Article Summary: The Will County Board authorized nearly $2 million in Motor Fuel Tax funds to begin Phase I design engineering for improvements...