Major Grade Separation Projects Advance with Engineering Contracts
The committee approved two significant engineering agreements for major railroad overpass projects totaling over $4 million.
TranSystems Corporation received a $4,003,256 contract for construction engineering services on the Lorenzo Road overpass project spanning the BNSF Railroad in county board District 1. This project, funded entirely by BNSF Railway, will construct a new two-span bridge carrying Lorenzo Road over the railway, including realignment of Cottage Road and temporary construction access.
The Lorenzo Road project represents one of two major grade separations planned to reduce train-related traffic delays in the county.
A separate agreement with Burns & McDonnell for supplemental design services on the Wilmington-Peotone Road corridor was approved for $1,902,165. This covers the section from I-55 to Drecksler Road spanning county board Districts 1 and 2.
The Wilmington-Peotone Road project emerged from a comprehensive study to improve east-west connectivity in the county and reduce conflicts between vehicular and rail traffic.
Construction timelines for both projects will depend on completion of design work and right-of-way acquisition.
Latest News Stories
Manhattan to Install Solar-Powered Flashing Beacons in School Zone
Resident Shares Personal Tragedy as Manhattan Proclaims Suicide Prevention Month
Manhattan Adopts 20-Year Comprehensive Plan to Guide Future Growth
WATCH: Legislator warns gas could reach $8 to $10 a gallon
White House announces new AI Education initiative
Chicago student petitions to restore bathroom doors
Alleged Epstein 50th birthday letter from Trump released
WATCH: Bonta disappointed with U.S. Supreme Court ruling
Trump’s tariffs ‘not survivable’ for some U.S. small businesses
Postal traffic to U.S. dropped 80% after end of duty-free shipping
Illinois quick hits: Hundreds of layoffs reported; man charged with converted handgun
‘Glaring failure:’ Lawmaker accuses Meta of failing to make AI chatbots kid-safe