Solar Farm Access Approved for Manhattan-Arsenal Road
The committee granted access approval for a solar farm development on Manhattan-Arsenal Road approximately 1,000 feet east of Cherry Hill Road.
The MCH Solar 1 project, developed by Soltage LLC, received a special use permit from Will County earlier this year. Because Manhattan-Arsenal Road is designated as a county freeway, any new access points require county board approval.
The solar facility will reuse an existing driveway access point and encompasses approximately 69 acres. The project includes solar panels, electrical equipment, access drives, stormwater management facilities, perimeter fencing, and vegetative buffers.
The approval allows the developer to proceed with obtaining final access permits once all other county requirements are met.
Latest News Stories
IL rep: As if Bears ‘had a plan to rob the bank’ before considering Indiana
Lincoln-Way High Schools Maintain Top State Rankings; EL Progress Jumps
Undersheriff Brian Conser Retires After 29 Years of Service
Officials warn against limits on loans for nursing students
FBI to scrap $5 billion move, Patel says
AGs say ‘As You Sow’ may violate antitrust laws with anti-fossil fuel alliance
Manhattan-Elwood Library Board Authorizes Steps to Sell Extra Lot
Storm hits California over Christmas; flood watch continues
IL dyslexia screening takes effect Jan. 1, drawing reading instruction debate
Colorado Springs, Denver residents pay among lowest property taxes in U.S.
Illinois quick hits: Pope reacts to Pritzker bill signing
Study reveals top U.S. states for K-12 education