Frankfort-Village-Board-Meeting-Graphic-June-16-2025

Meeting Briefs: Frankfort Village Board for June 16, 2025

Spread the love

Downtown Patios Approved, Parking Waived: The Village Board approved outdoor seating for The Loft and Grounded Coffee Bar on Ash Street. To support the downtown businesses, trustees also voted to waive all off-street parking requirements for both, which totaled 119 and 20 spaces, respectively. Mayor Ogle noted a previously planned expansion at The Loft is not proceeding.

Police Fleet Upgrades Authorized: Frankfort is investing up to $237,296 to modernize its police fleet. The board approved purchasing three 2025 Ford Police Interceptor utility vehicles and one 2026 Chevrolet Equinox investigator vehicle. A 2010 Ford Fusion was declared surplus to be sold at auction.

‘Pickled!’ Pickleball Facility Coming to Frankfort: A special use permit was granted for “Pickled!,” a new indoor pickleball facility to be located at 20825 S. LaGrange Road. The business plans to operate seven courts and a pro-shop, offering a new recreational option for residents in the B-2 Community Business District.

Public Wi-Fi Coming to Breidert Green: The board approved an $18,965 project to install public Wi-Fi at Breidert Green. Equipment will be mounted on the Grainery building to provide internet access for residents and visitors during community events. The system will feature separate networks for public, municipal, and special event use.

Board Approves Bills Totaling Over $842,000: The Village Board approved the payment of bills totaling $842,797.64. The authorized expenditures cover village operations across multiple funds, including the General Corporate, Motor Fuel Tax, Capital Development, and Sewer and Water funds.

New Pedestrian Safety Signs for Pfeiffer Road: The board authorized spending up to $26,500 to purchase and install three LED pedestrian crossing signs and four push-button activation devices at the intersection of Pfeiffer Road and Colorado Avenue. The measure is intended to improve motorist awareness and pedestrian safety.

Public Works to Receive New Pickup Truck: A 2025 Ford F-150 pickup truck will be purchased for the Public Works Department from Currie Motors of Frankfort at a cost not to exceed $43,259. The vehicle replacement was included in the FY 2025/26 Capital Budget.

Monument Sign to Be Replaced: The wooden monument sign at Old Frankfort Way and Route 45 will be replaced with a new limestone sign fabricated by Frankfort-based Tri-State Stone. The board approved the $15,633.12 expense, noting the new sign will match the one at Village Hall and be installed by Public Works staff.

Traffic Controls Added to Subdivisions: New stop and yield signs will be installed in the Misty Creek, Abbey Woods North, and The Reserve of Copper Creek subdivisions. The board passed an ordinance amending the village traffic code to add the new traffic controls as the developing neighborhoods see increased activity.

Dalke Residence Granted Setback Variance: Homeowners David and Julie Dalke received a zoning variance for their property at 662 Fairway Lane. The approval reduces the minimum side yard setback from 25 feet to 10 feet, allowing for the construction of an outdoor living and kitchen addition.

Affordable Housing Plan Update Adopted: The board adopted the required five-year update of its Affordable Housing Plan. While no changes were made to the plan itself, officials noted that the village’s proportion of affordable housing units increased from 3% in 2019 to 6.3% in 2023.

Leave a Comment





Latest News Stories

diamond shaped orange red reflector street sign that reads road

Laraway Road Widening Project in New Lenox and Frankfort Gets Additional $468,000 for Redesign

Article Summary: The Will County Board approved a supplemental agreement worth $468,374 for additional design and engineering work on the major Laraway Road expansion project. The funds are needed for...
solar panels photovoltaics in solar farm

“Federal Policy Uncertainty” Blamed for Delay of Peotone Solar Farm; County Grants Second Extension

Article Summary: The Will County Board has granted a second permit extension for a solar farm in Peotone Township after the developer, Trajectory Energy Partners, cited "ongoing uncertainty regarding federal...
solar panels photovoltaics in solar farm

Will County Grants Extensions to Five Solar Projects Sold to New Developers

Article Summary: The Will County Board approved first-time permit extensions for five commercial solar projects across Monee, Crete, and Joliet townships, all of which were recently sold to larger energy...
WCO 2025-09-27 at 9.04.10 AM

Will County Board Approves Controversial Drug Recovery Retreat in Crete Township

Article Summary: The Will County Board has approved a special use permit for The Second Story Foundation to operate a long-term residential recovery program for men on a 68-acre horse...
District 114 Bus

Parents Voice Alarms Over Bus Safety, Lateness in Manhattan School District

Article Summary: Parents raised serious transportation safety and reliability concerns at the Manhattan School District 114 board meeting, including a harrowing account of a kindergartener being dropped off at the...
Meeting Briefs

Meeting Summary and Briefs: Village of Manhattan Board of Trustees for September 16, 2025

The Manhattan Village Board took steps to prepare for future growth at its Tuesday meeting, awarding a contract of over half a million dollars to extend water and sewer infrastructure...
Joliet-Junior-college.-Graphic-Logo.4

Joliet Junior College Honors Seven Long-Serving Employees Upon Retirement

Joliet Junior College Board of Trustees Meeting | September 2025 Article SummaryThe Joliet Junior College Board of Trustees formally recognized seven long-serving employees who are retiring, including Dr. Robert "Bob"...
Screenshot 2025-09-27 at 8.39.48 AM

Manhattan Police Department Promotes Garrison to Commander, Diaz to Sergeant

Article Summary: The Manhattan Police Department solidified its command structure with the promotions of William Garrison to the rank of Commander and Bryan Diaz to Sergeant, who were both officially...
Meeting Briefs

Meeting Summary and Briefs: Manhattan Fire Protection District for August 18, 2025

Manhattan Fire Protection District | August 18, 2025 Meeting The Manhattan Fire Protection District Board of Trustees focused on the future of its facilities and public safety at its meeting...
Screenshot 2025-09-27 at 8.36.16 AM

Village of Manhattan Honors St. Joseph’s Catholic School on its 100th Anniversary

Article Summary: The Village of Manhattan celebrated a major community milestone at its Tuesday board meeting, officially honoring St. Joseph's Catholic School for its 100th anniversary with a formal proclamation...
Joliet-Junior-college.-Graphic-Logo.4

JJC Board Approves Contract with Adjunct Faculty Union

Joliet Junior College Board of Trustees Meeting | September 2025 Article SummaryThe Joliet Junior College (JJC) Board of Trustees approved a new collective bargaining agreement with the Joliet United Adjuncts...
Screenshot 2025-09-27 at 8.36.16 AM

Manhattan Awards $547K Contract for US 52 Infrastructure Extension to Spur Growth

Article Summary: The Village of Manhattan has awarded a $547,449 contract to Speece Construction for a significant sewer and water main extension project along the US 52, Smith Road, and...
manhattan fire district graphic logo.3

Fire District to Address Safety at High-Accident Intersections with County DOT

Manhattan Fire Protection District | August 18, 2025 Meeting Article Summary: The Manhattan Fire Protection District will meet with the Will County Department of Transportation to provide data and seek...
Meeting Briefs

Meeting Summary and Briefs: Manhattan Township for August 2025

Manhattan Township Meeting | August 2025 The Manhattan Township Board took steps to address the growing interest in renewable energy at its meeting on Tuesday, August 12, 2025, by scheduling...
Screenshot 2025-09-27 at 8.16.09 AM

Manhattan Eyes Major Water and Sewer Rate Hikes to Fund Over $50 Million in Infrastructure Projects

Article Summary: To address aging infrastructure and prepare for significant future growth, Manhattan officials are planning more than $50 million in crucial water and sewer system upgrades, which will necessitate...