The Will County Landfill Committee received a comprehensive technical update on the site investigation for the planned horizontal expansion of the county landfill, confirming the project remains on schedule. Consultants presented detailed findings from the completed geological and hydrogeological fieldwork, which will inform the final engineering and design of the new landfill area to ensure public and environmental safety.

Landfill Expansion Key Points:

  • Drilling of nine new borings and continuous soil and bedrock sampling for the expansion area is complete, with samples being sent for extensive laboratory analysis.

  • Fourteen new piezometers, or monitoring wells, have been installed to characterize groundwater conditions and will be used for an impact evaluation model.

  • Engineers are refining the expansion’s design, including adjusting the northern boundary to maximize airspace and designing a V-notched base for efficient leachate collection.

  • Despite the fieldwork phase taking slightly longer than anticipated, project consultants confirmed the overall expansion timeline has not been delayed.

The Will County Landfill Committee on Thursday received a detailed update on the extensive site investigation for the planned expansion of the county landfill, learning that the project remains on schedule as engineers begin analyzing a trove of geological data.

A consultant for the project, Mr. Fallon, walked committee members through the now-completed fieldwork phase, which involved drilling nine borings as deep as 140 feet to characterize the soil, clay, and bedrock at the proposed expansion site. He explained that the purpose of the in-depth investigation is to provide engineers with the necessary data to design a site that protects public health, safety, and welfare.

“We have logged and continuously sampled nine additional borings to supplement that information at the existing facility,” Fallon stated. “Those samples have all been delivered to the lab. And actually… we have already received back I would say about 75% of those analytical results.”

The investigation included collecting undisturbed soil samples using Shelby tubes and rock cores to conduct a battery of laboratory tests. These tests, Fallon explained, measure properties like soil density, moisture content, permeability, and shear strength. The results are critical for engineering calculations that ensure the stability of the landfill’s slopes and foundation.

In addition to soil stability, the investigation is focused on groundwater. Fourteen new piezometers—small-diameter wells—have been installed at various depths to monitor different water-bearing zones. This data will be used to create a groundwater impact evaluation model.

“We’ll take the landfill design once it’s once our engineers have developed that and then we’ll… place it into the into the geologic system,” Fallon said in response to a question from member Dawn Bullock. “And then we’ll assume that it’s leaking and we’ll evaluate… after 100 years after closure what are the what are the concentrations of this hypothetical plume at the zone of attenuation.”

Fallon noted that this modeling is a state requirement for the sighting application.

The data is already informing design tweaks. Stormwater modeling has shown that the planned retention ponds are larger than necessary, allowing engineers to push the landfill’s northern boundary slightly to “eek out a little more airspace.” They are also designing the base grades with a “V-notch design” to better channel leachate to a sump location for extraction.

County Board Speaker Joe VanDuyne asked if the water from the underlying aquifer could be utilized by the county. Fallon explained that this would be out of the question, citing both the unsuitability of the small monitoring wells for water supply and a deed restriction on the property. “We have a deed restriction we’re not allowed to use any of the water for drinking purposes,” he said.

Vice-Chair Kelly Hickey, who chaired the meeting, asked if there were any changes to the project’s timeline.

“We haven’t had a delay in the project yet,” Fallon responded. “The field investigation did take a little longer than we than we had thought it would… but within the larger framework of the project, I feel like we’re still on schedule.”

Leave a Comment





Latest News Stories

WCO Committee of the Whole

Will County Board Members Question Fairness of New Transit Tax Structure

Will County Committee of the Whole Meeting | December 2025 Article Summary: Will County Board members expressed concerns regarding the funding mechanisms and governance structure of the incoming Northern Illinois...
Will County P&Z Logo Planning Zoning

P&Z Commission Advances Plan for Construction Debris Fill Operation on Brandon Road

Will County Planning and Zoning Commission Meeting | December 2, 2025 Article Summary: The Will County Planning and Zoning Commission recommended approval for a map amendment and special use permit...
WCO Committee of the Whole

Regional Transit Agencies Tout New State Funding, Prepare for Shift to ‘NITA’

Will County Committee of the Whole Meeting | December 2025 Article Summary: Regional transit leaders presented their 2026 budgets to the Will County Board, highlighting that the recent passage of...
Manhattan School District 114 Logo Graphic

Manhattan School District 114 Board Approves 2025 Tax Levy; Plans Abatement to Maintain Tax Rate

Manhattan School District 114 Meeting | Dec. 10, 2025 Article Summary:The Manhattan School District 114 Board of Education approved its 2025 tax levy following a public hearing, setting the stage...
Meeting Briefs

Meeting Summary and Briefs: Village of Manhattan Board of Trustees for December 2, 2025

Village of Manhattan Board of Trustees Meeting | December 2, 2025 Overall Meeting SummaryThe Manhattan Village Board of Trustees met on Tuesday, December 2, 2025, to address a mixture of...
Will County Board Land Use Committee Graphic.3

New Lenox Used Car Dealership Approved by Land Use & Development Committee

Will County Land Use & Development Committee Meeting | December 2025 Article Summary: A special use permit for a used car dealership on Ford Drive in New Lenox Township was...
Will County Board Land Use Committee Graphic.1

Land Use Committee: Monee Solar Projects Granted Extensions; Battery Storage Plans Dropped

Will County Land Use & Development Committee Meeting | December 2025 Article Summary: The Will County Land Use and Development Committee granted time extensions for two separate solar farm projects...
Will County P&Z Logo Planning Zoning.2

P&Z Commission: New Women’s Recovery Center Proposed for Patterson Road Receives Support

Will County Planning and Zoning Commission Meeting | December 2, 2025 Article Summary: The Planning and Zoning Commission unanimously recommended approval for a new inpatient drug and alcohol rehabilitation facility...
Judy Ogalla

Ogalla Blasts New State Solar Legislation

Will County Land Use & Development Committee Meeting | December 2025 Article Summary: During a discussion on zoning matters, Will County Board Member Judy Ogalla strongly criticized the passage of...
Will County Board Land Use Committee Graphic.4

Committee Postpones Vote on Brandon Road Fill Operation After Tree Clearing Allegations

Will County Land Use & Development Committee Meeting | December 2025 Article Summary: The Will County Land Use and Development Committee voted to postpone a decision on a proposed clean...
Meeting Briefs

Meeting Summary and Briefs: Will County Planning and Zoning Commission for December 2, 2025

Will County Planning and Zoning Commission Meeting | December 2, 2025 Overall Meeting SummaryThe Will County Planning and Zoning Commission met on December 2, 2025, to consider a variety of...
Metra

Metra Announces No Fare Hikes; Highlights Bridge Projects in Joliet and Mokena

Will County Committee of the Whole Meeting | December 2025 Article Summary: Metra officials presented a balanced 2026 budget to the Will County Board, confirming that riders will not see...
Screenshot 2025-12-04 at 11.30.23 AM

Village Bolsters Winter Operations with New Hires and Truck Purchase

Village of Manhattan Board of Trustees Meeting | December 2, 2025 Article Summary: To prepare for the winter season, the Manhattan Village Board authorized the hiring of a seasonal snowplow...

Public Works Committee: Will County Consolidates Paratransit Services Amid Funding Debates

Public Works & Transportation Committee Meeting | December 2, 2025 Article Summary: The Will County Board’s Public Works Committee advanced an agreement to consolidate paratransit services into a single countywide...
Will County P&Z Logo Planning Zoning

P&Z Commission: Peotone Area Variances Forwarded for Garage and Pole Barn

Will County Planning and Zoning Commission Meeting | December 2, 2025 Article Summary: The Will County Planning and Zoning Commission approved variance requests for two properties in Peotone Township, allowing...