frankfort-village-hall-graphic-logo.7

Frankfort Advances Plans for New Multi-Use Paths to Boost Pedestrian Safety

Spread the love

Article Summary
The Frankfort Village Board has approved a $77,500 agreement with Robinson Engineering, Ltd. to design two new multi-use paths aimed at improving safety and connectivity in Main Park and along Pfeiffer Road. The project addresses resident concerns about pedestrian safety during sporting events and will connect southeastern neighborhoods to the village’s broader trail system.

Multi-Use Path Agreement Key Points:

  • The board approved a $77,500 professional services agreement with Robinson Engineering, Ltd. for the design phase.

  • One path will be built on the west side of Locust Street in Main Park, connecting the north and south parking lots.

  • A second path will run along the east side of Pfeiffer Road, from Laraway Road south to an existing path in the Stone Creek subdivision.

  • The fee covers design, topographic and property surveying, engineering plans, and bidding services.

FRANKFORT – Plans to enhance pedestrian safety and trail connectivity in Frankfort are moving forward after the Village Board on Monday approved a $77,500 contract to design two new multi-use paths.

The board authorized an agreement with Robinson Engineering, Ltd. for the design of a path within Main Park and another along a stretch of Pfeiffer Road. The projects are intended to address safety concerns and expand the village’s trail network.

Trustee Adam Borrelli, who presented the resolution, called the project “a pleasure to present.” He detailed the two locations, noting the first path will run along the west side of Locust Street in Main Park, from the north parking lot to the south parking lot. The second will be constructed on the east side of Pfeiffer Road, extending south from Laraway Road to connect with an existing path in the Stone Creek Phase I subdivision.

During board comments, Borrelli emphasized the project’s importance, calling it a “huge win.” He said the Main Park path directly responds to safety concerns raised by residents.

“Specifically during sporting events, specifically Falcons, and in the fall when it gets real busy over there… the board worked with the park district to come up with a plan to put a walking path along Locust there so that people aren’t walking in the street when they walk over to the ball fields,” Borrelli said. “I think that’s going to improve safety tremendously.”

The Pfeiffer Road path will provide a critical link for residents in the southeastern part of the village. “This is a little south extension that will then connect the neighborhood that starts at Stone Creek, but then also Lake View Estates and so forth,” Borrelli explained. “That’s going to be a huge improvement for our residents.”

The $77,500 fee to Robinson Engineering covers the initial design phase, which includes topographic surveying, property surveying, creating engineering plans and specifications, and handling bidding services. Construction costs are separate; preliminary estimates included in the agenda packet project the Main Park path could cost $180,000 and the Pfeiffer Road path could cost $375,000.

Trustee Maura Rigoni, who is employed part-time by Robinson Engineering, abstained from the vote on this item to avoid a conflict of interest. “For the record, I am not an owner, officer, or registered agent, and I do not have any financial interest in Robinson Engineering beyond my part-time employment,” Rigoni stated before abstaining.

Leave a Comment





Latest News Stories

Meeting Briefs

Manhattan Village Board Briefs

Banks Farm Development: The village board approved six separate resolutions demanding payment on letters of credit for various phases of the Banks Farm Development Villas of Prairie Trails project, covering...
Frankfort-Village-Board-Meeting-Graphic

Frankfort Board Approves New Wendy’s on Route 30 With Numerous Modifications

A new Wendy's restaurant is set to be built at the northwest corner of U.S. Route 30 and Frankfort Square Road after the Frankfort Village Board unanimously approved the project...
Frankfort-Village-Board-Meeting-Graphic

Historic Downtown Frankfort Property Granted Deck and Patio Variances

The owners of a historic mixed-use building in downtown Frankfort have received approval for six zoning variances to construct a new paver patio and a second-floor rear deck. The Frankfort...
MH 114 June 2

Manhattan School Board Approves Staff Changes, Healthcare Extension in Special Session

Manhattan School District 114's Board of Education approved several personnel changes and a healthcare extension during a special meeting Monday evening, conducting most of its business in closed session. The...
Frankfort-Village-Board-Meeting-Graphic

Frankfort Approves $1.3 Million in Bills, Including Annual Insurance Payment

The Frankfort Village Board authorized over $1.3 million in payments at its meeting Monday, with nearly half of the total amount covering the village's annual insurance premiums. Trustees unanimously approved...
Meeting Briefs

School District 114 June 2 Meeting Briefs

Staff Departures: Manhattan School District 114 accepted the resignations of Emily Corcoran and Caroline Pesa-Miller, both effective at the end of the 2025 school year. The board approved both resignations...
Meeting Briefs

Meeting Briefs: Frankfort Village Board for June 2, 2025

Wendy's Project Approved with Multiple Variances: The Village Board gave final approval for a new Wendy's restaurant at U.S. Route 30 and Frankfort Square Road. The project required a major change...
frankfort-park-district.1

Frankfort Park Board Holds Closed-Door Talks on Five Oaks HOA Dispute

The Frankfort Park District Board of Commissioners entered into a closed executive session on Tuesday, May 27, to discuss pending litigation concerning the Five Oaks Park parcel, signaling a deepening...
MH VB 5--22

Manhattan Board Changes Meeting Time, Limits Public Comment

Village moves to 5:30 p.m. start time and reduces speaking period from five to three minutes The Village of Manhattan Board of Trustees approved two ordinance changes Tuesday that will...
MH VB 5--22

Manhattan Challenges Neighboring Villages to Pop Tab Competition

Community fundraising effort for Ronald McDonald House expands to include multiple villages The Village of Manhattan has officially challenged neighboring communities to a summer-long pop tab collection competition benefiting the...
Meeting Briefs

Manhatttan Village Board Meeting Briefs

MUNICIPAL UPDATES Memorial Day Services Planned: The I Honor Banner Ceremony will take place Sunday at 10 a.m. at the Manhattan Township Building, 230 S. Wabash Street. The ceremony dedicates...
Frankfort-Township-Logo-Graphic

Frankfort Township Approves Employee Raises, Details Major Infrastructure and Service Projects

Frankfort Township employees will receive a 2.5% cost-of-living pay increase after the Board of Trustees unanimously approved the adjustment at its Monday, May 19 meeting. The move came as Supervisor...
MFPD-Logo-Fire District

Fire Station Construction Bids Due June 3, Storm Generates 40 Emergency Calls

The Manhattan Fire Protection District has received strong interest from contractors for its new fire station project, with construction bids due back June 3 and groundbreaking still targeted for July....
Frankfort-Township-Logo-Graphic

New High-End Bar ‘Ace & Vine’ Gets Green Light from Township Board

A new bar focused on high-end liquor and an extensive wine collection is one step closer to opening in Frankfort Township after the Board of Trustees voted to recommend a...
MFPD-Logo-Fire District

Fire District Maintains Strong Call Volume, Equipment Readiness

The Manhattan Fire Protection District is maintaining steady emergency response capabilities while addressing routine equipment maintenance needs across its two-station operation. Deputy Chief Dave Piper's April operational report showed continued...