frankfort-village-hall-graphic-logo.7

Frankfort Advances Plans for New Multi-Use Paths to Boost Pedestrian Safety

Spread the love

Article Summary
The Frankfort Village Board has approved a $77,500 agreement with Robinson Engineering, Ltd. to design two new multi-use paths aimed at improving safety and connectivity in Main Park and along Pfeiffer Road. The project addresses resident concerns about pedestrian safety during sporting events and will connect southeastern neighborhoods to the village’s broader trail system.

Multi-Use Path Agreement Key Points:

  • The board approved a $77,500 professional services agreement with Robinson Engineering, Ltd. for the design phase.

  • One path will be built on the west side of Locust Street in Main Park, connecting the north and south parking lots.

  • A second path will run along the east side of Pfeiffer Road, from Laraway Road south to an existing path in the Stone Creek subdivision.

  • The fee covers design, topographic and property surveying, engineering plans, and bidding services.

FRANKFORT – Plans to enhance pedestrian safety and trail connectivity in Frankfort are moving forward after the Village Board on Monday approved a $77,500 contract to design two new multi-use paths.

The board authorized an agreement with Robinson Engineering, Ltd. for the design of a path within Main Park and another along a stretch of Pfeiffer Road. The projects are intended to address safety concerns and expand the village’s trail network.

Trustee Adam Borrelli, who presented the resolution, called the project “a pleasure to present.” He detailed the two locations, noting the first path will run along the west side of Locust Street in Main Park, from the north parking lot to the south parking lot. The second will be constructed on the east side of Pfeiffer Road, extending south from Laraway Road to connect with an existing path in the Stone Creek Phase I subdivision.

During board comments, Borrelli emphasized the project’s importance, calling it a “huge win.” He said the Main Park path directly responds to safety concerns raised by residents.

“Specifically during sporting events, specifically Falcons, and in the fall when it gets real busy over there… the board worked with the park district to come up with a plan to put a walking path along Locust there so that people aren’t walking in the street when they walk over to the ball fields,” Borrelli said. “I think that’s going to improve safety tremendously.”

The Pfeiffer Road path will provide a critical link for residents in the southeastern part of the village. “This is a little south extension that will then connect the neighborhood that starts at Stone Creek, but then also Lake View Estates and so forth,” Borrelli explained. “That’s going to be a huge improvement for our residents.”

The $77,500 fee to Robinson Engineering covers the initial design phase, which includes topographic surveying, property surveying, creating engineering plans and specifications, and handling bidding services. Construction costs are separate; preliminary estimates included in the agenda packet project the Main Park path could cost $180,000 and the Pfeiffer Road path could cost $375,000.

Trustee Maura Rigoni, who is employed part-time by Robinson Engineering, abstained from the vote on this item to avoid a conflict of interest. “For the record, I am not an owner, officer, or registered agent, and I do not have any financial interest in Robinson Engineering beyond my part-time employment,” Rigoni stated before abstaining.

Leave a Comment





Latest News Stories

Op-Ed: Senate Bill 3070 provides sensible solution for students, manufacturers

Op-Ed: Senate Bill 3070 provides sensible solution for students, manufacturers

By Ben BarnettThe Center Square Illinois manufacturers face a serious problem. We have modern, high-tech facilities running at full capacity, but we struggle to find the young talent needed to...
Lincoln Way West Track

Novotny, Slazyk Headline Lincoln-Way West’s Multi-Win Effort at Lockport Triangular

The Lincoln-Way West girls track and field team continued to showcase its deep roster of talent on Tuesday, April 21, 2026, capturing a flurry of individual titles at the Lockport...
Illinois millionaire’s tax moves closer to November ballot

Illinois millionaire’s tax moves closer to November ballot

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – A measure giving Illinois voters the opportunity to consider a millionaire’s tax is one step closer to...
(Photo by Chad Merda)

Oldest preserve expansion pushes acreage past 24,000 milestone

The Forest Preserve’s first acquisition of the year not only expands the District’s oldest preserve, it also pushes total acreage past the 24,000 mark. On March 27, the Forest Preserve...
Lincoln Way West Warriors Softball

Lincoln-Way West Holds Off Lockport 3-2 in Tense Conference Clash

The Lincoln-Way West varsity softball team claimed a narrow 3-2 road conference victory over Lockport on Monday, relying on timely hitting to fend off a late rally by the hosts....
Lincoln Way West Warriors Baseball

Lincoln-Way West Maximizes Opportunities to Walk Off Homewood-Flossmoor 4-3

The Lincoln-Way West varsity baseball team showcased maximum efficiency and late-game resilience on Monday, overcoming a quiet day at the plate to secure a dramatic 4-3 walk-off conference victory over...
Lincoln Way West Track

Distance Runners, Throwers Propel Lincoln-Way West to Second-Place Finish at BBCHS Triangular

The Lincoln-Way West boys track and field team traveled to Bradley-Bourbonnais Community High School on Monday, April 20, 2026, where a dominant showing in the distance events and throws helped...
Manhattan Park District Graphic

Meeting Summary and Briefs: Manhattan Park Board for March 12, 2026

Manhattan Park Board Meeting | March 12, 2026 The Manhattan Park District Board convened on Thursday, March 12, 2026, for a regular meeting that focused heavily on the district's operational...
Lincoln Way West Warriors Baseball

Early Offensive Surge Propels Lincoln-Way West Past Oswego 11-4

The Lincoln-Way West varsity baseball team brought its bats early and often on Saturday, racing out to a commanding lead to secure an 11-4 non-conference road victory over Oswego. Lincoln-Way...
Lincoln Way West Track

Lusciatti’s Sprint Sweep, Spee’s 800 Crown Propel Lincoln-Way West to Second Place at Bud Mohns Invitational

The Lincoln-Way West boys track and field team delivered a statement performance on Saturday, April 18, 2026, capturing second place in a loaded 15-team field at the Bud Mohns-Bob Cohoon...
Will County Board Graphic.04

Meeting Summary and Briefs: Will County Board Executive Committee for April 9, 2026

Will County Board Executive Committee Meeting | April 9, 2026 The Will County Board Executive Committee met on Thursday, April 9, 2026, to process a diverse agenda featuring major strategic,...
Rock Run Preserve —Photo by Chad Merda

On the road to 100 years: How the Forest Preserve District expanded

As the Forest Preserve District approaches its centennial year in 2027 with a total of nearly 24,000 protected acres, it’s a good time to reflect on how the District grew...
Lincoln Way West Warriors Baseball

Minooka Rallies in Seventh to Edge Lincoln-Way West 4-3

Despite an explosive three-run first inning highlighted by a Michael Pettit home run, the Lincoln-Way West varsity baseball team could not hold off a late surge from Minooka, falling 4-3...
Lincoln Way West Warriors Softball

Late Rally Propels Lincoln-Way East Past Lincoln-Way West 8-6

The Lincoln-Way East varsity softball team staged a dramatic late-game comeback on Friday, erasing a five-run deficit to defeat conference rival Lincoln-Way West 8-6 on the road. Lincoln-Way West controlled...
Illinois proposal aims to improve detection of potentially staged deaths

Illinois proposal aims to improve detection of potentially staged deaths

By Catrina Barker | The Center Square contributorThe Center Square (The Center Square) – State Sen. Craig Wilcox, R-Woodstock, says too many deaths initially ruled as suicides may actually be...