frankfort-village-hall-graphic-logo.7

Frankfort Advances Plans for New Multi-Use Paths to Boost Pedestrian Safety

Spread the love

Article Summary
The Frankfort Village Board has approved a $77,500 agreement with Robinson Engineering, Ltd. to design two new multi-use paths aimed at improving safety and connectivity in Main Park and along Pfeiffer Road. The project addresses resident concerns about pedestrian safety during sporting events and will connect southeastern neighborhoods to the village’s broader trail system.

Multi-Use Path Agreement Key Points:

  • The board approved a $77,500 professional services agreement with Robinson Engineering, Ltd. for the design phase.

  • One path will be built on the west side of Locust Street in Main Park, connecting the north and south parking lots.

  • A second path will run along the east side of Pfeiffer Road, from Laraway Road south to an existing path in the Stone Creek subdivision.

  • The fee covers design, topographic and property surveying, engineering plans, and bidding services.

FRANKFORT – Plans to enhance pedestrian safety and trail connectivity in Frankfort are moving forward after the Village Board on Monday approved a $77,500 contract to design two new multi-use paths.

The board authorized an agreement with Robinson Engineering, Ltd. for the design of a path within Main Park and another along a stretch of Pfeiffer Road. The projects are intended to address safety concerns and expand the village’s trail network.

Trustee Adam Borrelli, who presented the resolution, called the project “a pleasure to present.” He detailed the two locations, noting the first path will run along the west side of Locust Street in Main Park, from the north parking lot to the south parking lot. The second will be constructed on the east side of Pfeiffer Road, extending south from Laraway Road to connect with an existing path in the Stone Creek Phase I subdivision.

During board comments, Borrelli emphasized the project’s importance, calling it a “huge win.” He said the Main Park path directly responds to safety concerns raised by residents.

“Specifically during sporting events, specifically Falcons, and in the fall when it gets real busy over there… the board worked with the park district to come up with a plan to put a walking path along Locust there so that people aren’t walking in the street when they walk over to the ball fields,” Borrelli said. “I think that’s going to improve safety tremendously.”

The Pfeiffer Road path will provide a critical link for residents in the southeastern part of the village. “This is a little south extension that will then connect the neighborhood that starts at Stone Creek, but then also Lake View Estates and so forth,” Borrelli explained. “That’s going to be a huge improvement for our residents.”

The $77,500 fee to Robinson Engineering covers the initial design phase, which includes topographic surveying, property surveying, creating engineering plans and specifications, and handling bidding services. Construction costs are separate; preliminary estimates included in the agenda packet project the Main Park path could cost $180,000 and the Pfeiffer Road path could cost $375,000.

Trustee Maura Rigoni, who is employed part-time by Robinson Engineering, abstained from the vote on this item to avoid a conflict of interest. “For the record, I am not an owner, officer, or registered agent, and I do not have any financial interest in Robinson Engineering beyond my part-time employment,” Rigoni stated before abstaining.

Leave a Comment





Latest News Stories

Illinois Quick Hits: Report says Pekin Bowling Center 'taxed out of business'

Illinois Quick Hits: Report says Pekin Bowling Center ‘taxed out of business’

By Jim Talamonti | The Center SquareThe Center Square Sunset Lanes in Pekin is set to close later this month as the bowling center’s owner says it is being “taxed...
Tiffany vows to end subsidies for data centers in Wisconsin

Tiffany vows to end subsidies for data centers in Wisconsin

By Jon StyfThe Center Square Wisconsin congressman and candidate for governor Tom Tiffany said that he will “end subsidies for data centers in Wisconsin” if he becomes governor. Tiffany was...
Screenshot 2026-03-29 at 4.44.29 PM

Public Works Secures $58,900 Valve Trailer, Seeks Federal Grants for Infrastructure

Village of Manhattan Meeting | March 16, 2026 Article Summary: The Manhattan Village Board authorized the purchase of a specialized $58,900 trailer to modernize water valve maintenance, while Public Works announced...
Screenshot 2026-05-05 at 1.39.16 PM

JJC Trustee Alleges Board Exclusion, Discriminatory Policies During Tense Meeting

Joliet Junior College Board of Trustees Meeting | March 11, 2026 Article Summary: Deep divisions on the Joliet Junior College Board of Trustees spilled into public view as Trustee Maureen Broderick...
Firefighter age bill stalled despite union backing

Firefighter age bill stalled despite union backing

By Catrina Barker | The Center Square contributorThe Center Square (The Center Square) – A proposed Illinois bill aimed at addressing firefighter shortages by lowering the minimum hiring age has...
Will County Board Land Use Committee Graphic.3

County Board Members Pitch “Granny Flats,” Hobby Farm Zoning, and Farmland Mitigation in LRMP Brainstorm

Will County Board Land Use & Development Committee Meeting | March 26, 2026 Article Summary: During a brainstorming workshop for the county's new Land Resource Management Plan, Will County Board...
Screenshot 2026-03-29 at 4.21.41 PM

Meeting Summary and Briefs: Manhattan School District 114 for March 25, 2026

Manhattan School District 114 Meeting | March 25, 2026 The Manhattan School District 114 Board of Education held a special meeting on Wednesday, March 25, 2026, to address time-sensitive capital...
Hyundai Translead

Will County Board Approves Tax Abatement for $345 Million Hyundai Translead Project

Will County Board Meeting | March 19, 2026 Article Summary: The Will County Board has authorized an agreement of intent to abate taxes for a massive $345 million manufacturing project...
lincoln way school district 210 logo.2

Lincoln-Way 210 Advances Summer Site Improvements and Asbestos Abatement Projects

Lincoln-Way Community High School District 210 Meeting | March 19, 2026 Article Summary: The Board of Education approved an asbestos abatement contract and initial site improvement bids to prepare for...
Lawmaker criticizes surplus spending bill

Lawmaker criticizes surplus spending bill

By Catrina Baker | The Center Square contributorThe Center Square (The Center Square) – A proposal aimed at helping local governments manage retiree health care costs is drawing differing views...
Screenshot 2026-03-29 at 4.21.41 PM

Manhattan District 114 Board Abates $252,430 from 2025 Bond and Interest Levy

Manhattan School District 114 Meeting | March 25, 2026 Article Summary: Utilizing finalized property value estimates from the county, the Manhattan School District 114 Board of Education approved a levy abatement...
Screenshot 2026-03-29 at 4.44.29 PM

Manhattan Approves Estimated $1.1 Million Resurfacing Project for Leighlinbridge Subdivision

Village of Manhattan Meeting | March 16, 2026 Article Summary: The Village of Manhattan approved a state resolution to secure Motor Fuel Tax funding for a major road resurfacing project targeting...
Salvation Army rehab ‘enrollees’ who work at thrift stores aren’t ‘employees’

Salvation Army rehab ‘enrollees’ who work at thrift stores aren’t ‘employees’

By Jonathan Bilyk | Legal NewslineThe Center Square A few days after agreeing to let them proceed with their class action against one of America's most prominent charities under labor...
Illinois housing affordability efforts pit tax cuts against new spending

Illinois housing affordability efforts pit tax cuts against new spending

By Sean Reed | The Center SquareThe Center Square (The Center Square) – As homeownership may be growing out of reach for many young residents, Illinois lawmakers are split between...
Illinois Quick Hits: Chicago city workers owe more than $19M

Illinois Quick Hits: Chicago city workers owe more than $19M

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – Chicago city workers reportedly owe more than $19 million in traffic tickets, water bills and fines, yet...