Manhattan Eyes Major Water and Sewer Rate Hikes to Fund Over $50 Million in Infrastructure Projects
Article Summary: To address aging infrastructure and prepare for significant future growth, Manhattan officials are planning more than $50 million in crucial water and sewer system upgrades, which will necessitate a series of rate increases for residents over the next several years.
Manhattan Village Board Finance Workshop Key Points:
-
Future projects include a new $6 million water tower and a $42.6 million expansion of the wastewater treatment plant.
-
A proposed multi-year rate increase would begin with a $1.65 hike in the water usage rate on Jan. 1, 2026, followed by further increases in subsequent years.
-
Officials state the upgrades are necessary to replace 20-year-old equipment, accommodate a projected population of 20,000 by 2050, and meet stricter IEPA regulations.
MANHATTAN – Village officials are preparing for a massive, multi-year overhaul of Manhattan’s water and sewer infrastructure, a plan carrying a price tag of more than $50 million that will require gradual rate increases for residents to fund.
The scope of the necessary projects was detailed during a Village Board Finance Workshop on September 9. Mayor Mike Adrieansen said the workshop’s purpose was to review major improvements required within the next five years to ensure the village’s infrastructure remains reliable.
“After careful analysis with the Public Works Department and Finance Department, it’s necessary to increase water and sewer rates and certain fees,” Mayor Adrieansen said, proposing that the rate hikes be spread over three years to lessen the impact on residents.
The proposed projects include a new Public Works facility (
6million),anewwatertowerforWell7(
6 million), and a comprehensive expansion of the well water treatment plant estimated to cost $42.6 million. These are in addition to the ongoing $9.7 million project for the Well 7 treatment and radium removal facility.
Dan Small of Strand Associates, the village’s engineering consultant, explained that growth is a major driver for the upgrades. The village’s 2025 Comprehensive Plan projects a population of 20,000 by the year 2050, which will require the wastewater treatment plant’s capacity to double from its current 1.35 million gallons per day (MGD) to 2.7 MGD.
However, Small noted that growth is not the only factor. “The last project was in 2005 and the mechanicals are going to need to be replaced soon,” he said. “The mechanicals are about twenty years old and that is about the shelf life before items start breaking down.”
The expansion will also address new regulatory requirements from the Illinois Environmental Protection Agency (IEPA), which is reducing the allowable limit for phosphorus in treated wastewater.
To fund the bonds for these large-scale projects, the village is proposing a multi-step increase in utility rates. The plan includes a $1.65 increase in the water usage rate starting January 1, 2026, followed by annual increases of $0.61 for the next three years. The sewer rate would see a proposed increase of $1.31 each year, beginning in 2027 for three years. Officials noted these figures could be adjusted if grant funding is secured.
Latest News Stories
Illinois quick hits: Illinois House speaker’s son to attend private school; AFSCME workers set strike date at Illinois State University; IDOT urges public to avoid distracted driving
Federal-state showdown looms over regulation of prediction markets
No-knock warrant legislation brings Chicago victim, Illinois gun group together
Trump promises ‘complete demolition’ in Iran as deadline looms
‘We leave no American behind’: President Trump details Easter rescue of downed airman
Michigan charges dentist in alleged ‘massive’ Medicaid fraud scheme
Illinois bill sparks debate over police privacy vs. public access
Signature process begins to ban large data centers in Ohio
U.S. Supreme Court agrees to hear veteran’s benefits challenge
Supreme Court declines to hear challenge to Illinois public transport gun ban
Illinois Quick Hits: Report says Pekin Bowling Center ‘taxed out of business’
Tiffany vows to end subsidies for data centers in Wisconsin