Screenshot 2025-09-27 at 8.16.09 AM

Manhattan Eyes Major Water and Sewer Rate Hikes to Fund Over $50 Million in Infrastructure Projects

Spread the love

Article Summary: To address aging infrastructure and prepare for significant future growth, Manhattan officials are planning more than $50 million in crucial water and sewer system upgrades, which will necessitate a series of rate increases for residents over the next several years.

Manhattan Village Board Finance Workshop Key Points:

  • Future projects include a new $6 million water tower and a $42.6 million expansion of the wastewater treatment plant.

  • A proposed multi-year rate increase would begin with a $1.65 hike in the water usage rate on Jan. 1, 2026, followed by further increases in subsequent years.

  • Officials state the upgrades are necessary to replace 20-year-old equipment, accommodate a projected population of 20,000 by 2050, and meet stricter IEPA regulations.

MANHATTAN – Village officials are preparing for a massive, multi-year overhaul of Manhattan’s water and sewer infrastructure, a plan carrying a price tag of more than $50 million that will require gradual rate increases for residents to fund.

The scope of the necessary projects was detailed during a Village Board Finance Workshop on September 9. Mayor Mike Adrieansen said the workshop’s purpose was to review major improvements required within the next five years to ensure the village’s infrastructure remains reliable.

“After careful analysis with the Public Works Department and Finance Department, it’s necessary to increase water and sewer rates and certain fees,” Mayor Adrieansen said, proposing that the rate hikes be spread over three years to lessen the impact on residents.

The proposed projects include a new Public Works facility (

6million),anewwatertowerforWell7(

6 million), and a comprehensive expansion of the well water treatment plant estimated to cost $42.6 million. These are in addition to the ongoing $9.7 million project for the Well 7 treatment and radium removal facility.

Dan Small of Strand Associates, the village’s engineering consultant, explained that growth is a major driver for the upgrades. The village’s 2025 Comprehensive Plan projects a population of 20,000 by the year 2050, which will require the wastewater treatment plant’s capacity to double from its current 1.35 million gallons per day (MGD) to 2.7 MGD.

However, Small noted that growth is not the only factor. “The last project was in 2005 and the mechanicals are going to need to be replaced soon,” he said. “The mechanicals are about twenty years old and that is about the shelf life before items start breaking down.”

The expansion will also address new regulatory requirements from the Illinois Environmental Protection Agency (IEPA), which is reducing the allowable limit for phosphorus in treated wastewater.

To fund the bonds for these large-scale projects, the village is proposing a multi-step increase in utility rates. The plan includes a $1.65 increase in the water usage rate starting January 1, 2026, followed by annual increases of $0.61 for the next three years. The sewer rate would see a proposed increase of $1.31 each year, beginning in 2027 for three years. Officials noted these figures could be adjusted if grant funding is secured.

Leave a Comment





Latest News Stories

will-county-board.2

Major Grade Separation Projects Advance with Engineering Contracts

The committee approved two significant engineering agreements for major railroad overpass projects totaling over $4 million. TranSystems Corporation received a $4,003,256 contract for construction engineering services on the Lorenzo Road...
MH VB 6-3

Kelly Gibbons Named Chairperson of Manhattan Planning and Zoning Commission

The Manhattan Village Board appointed Kelly Gibbons as chairperson of the Planning and Zoning Commission for a two-year term running through May 1, 2027. Gibbons, who already serves as a...
County-Board-Room

County Authorizes Condemnation for Francis Road Project

The committee authorized the State's Attorney's Office to proceed with condemnation cases for right-of-way acquisition needed for Francis Road improvements between Gougar Road and Interstate 80. Eight property parcels are...
will-county-board

Solar Farm Access Approved for Manhattan-Arsenal Road

The committee granted access approval for a solar farm development on Manhattan-Arsenal Road approximately 1,000 feet east of Cherry Hill Road. The MCH Solar 1 project, developed by Soltage LLC,...
will-county-board.3

Will County Finance Committee Meeting Briefs

Budget Transfers Approved: The Finance Committee approved transferring $18,643 within the Supervisor of Assessments budget to move funds from software licensing to computer hardware purchases. Animal Protection Services Funding: Committee...
will-county-board.2

Public Works Committee Briefs

Major Projects Update: Construction continues on several major projects including the 80th Avenue expressway overpass, Laraway Road widening near Cedar Road, and Bell Road improvements. The Bell Road project at...
will-county-board

Capital Improvements & IT Committee Briefs

Bed donation program: Will County donated old beds from Sunny Hill Nursing Home to Joliet Junior College and Project Cure after the nursing home received all new beds for residents....
Meeting Briefs

Manhattan Village Board Briefs

Banks Farm Development: The village board approved six separate resolutions demanding payment on letters of credit for various phases of the Banks Farm Development Villas of Prairie Trails project, covering...
Frankfort-Village-Board-Meeting-Graphic

Frankfort Board Approves New Wendy’s on Route 30 With Numerous Modifications

A new Wendy's restaurant is set to be built at the northwest corner of U.S. Route 30 and Frankfort Square Road after the Frankfort Village Board unanimously approved the project...
Frankfort-Village-Board-Meeting-Graphic

Historic Downtown Frankfort Property Granted Deck and Patio Variances

The owners of a historic mixed-use building in downtown Frankfort have received approval for six zoning variances to construct a new paver patio and a second-floor rear deck. The Frankfort...
MH 114 June 2

Manhattan School Board Approves Staff Changes, Healthcare Extension in Special Session

Manhattan School District 114's Board of Education approved several personnel changes and a healthcare extension during a special meeting Monday evening, conducting most of its business in closed session. The...
Frankfort-Village-Board-Meeting-Graphic

Frankfort Approves $1.3 Million in Bills, Including Annual Insurance Payment

The Frankfort Village Board authorized over $1.3 million in payments at its meeting Monday, with nearly half of the total amount covering the village's annual insurance premiums. Trustees unanimously approved...
Meeting Briefs

School District 114 June 2 Meeting Briefs

Staff Departures: Manhattan School District 114 accepted the resignations of Emily Corcoran and Caroline Pesa-Miller, both effective at the end of the 2025 school year. The board approved both resignations...
Meeting Briefs

Meeting Briefs: Frankfort Village Board for June 2, 2025

Wendy's Project Approved with Multiple Variances: The Village Board gave final approval for a new Wendy's restaurant at U.S. Route 30 and Frankfort Square Road. The project required a major change...
frankfort-park-district.1

Frankfort Park Board Holds Closed-Door Talks on Five Oaks HOA Dispute

The Frankfort Park District Board of Commissioners entered into a closed executive session on Tuesday, May 27, to discuss pending litigation concerning the Five Oaks Park parcel, signaling a deepening...