Screenshot 2025-10-25 at 10.48.48 AM

New Lenox Solar Farm Proposal Advances with Conditions, Following Village and Forest Preserve Input

Spread the love

Will County Planning and Zoning Commission Meeting | October 21, 2025

Article Summary: The Will County Planning and Zoning Commission recommended approval for a 62.7-acre commercial solar energy facility in New Lenox Township, contingent on several conditions, including the development of an emergency response plan and adherence to landscaping requests from the Village of New Lenox. The project, proposed by Nexamp Solar LLC, aims to contribute to Illinois’ renewable energy goals under the Climate and Equitable Jobs Act (CEJA).

Spencer Road Solar Farm Key Points:

  • Project Scope: A special use permit was sought for a commercial solar energy facility on a 110-acre property on South Spencer Road, utilizing approximately 62.7 acres for two projects totaling 5.25 MW (AC).

  • Variances Approved: The commission also recommended variances to allow pollinator-friendly ground cover to grow up to 36 inches (from 13 inches) and to reduce the required number of mowings from five to one annually.

  • Local Input: The Village of New Lenox did not object but recommended conditions concerning setbacks, access drive surfacing, fencing, and landscape screening. The Forest Preserve District of Will County also provided recommendations to protect local wildlife.

  • State Law Compliance: The project falls under Illinois Public Law 102-1123, which sets specific parameters and timelines for counties to review commercial solar energy proposals.

JOLIET, IL – The Will County Planning and Zoning Commission on Tuesday, October 21, 2025, recommended approval for a large-scale commercial solar energy facility on approximately 62.7 acres of agricultural land in New Lenox Township. The recommendation, which now goes to the full Will County Board for a final decision, includes a special use permit and two variances aimed at promoting pollinator-friendly habitats on the site.

The project, proposed by developer Nexamp Solar LLC under the names Spencer Road Solar East LLC and Spencer Road Solar West LLC, involves constructing two adjacent solar facilities on a 110-acre property located on South Spencer Road, south of the Village of New Lenox. The combined facilities will feature approximately 12,029 solar panels on single-axis tracker systems, generating a total of 5.25 megawatts (AC).

The proposal is part of the state’s Adjustable Block program under the Climate and Equitable Jobs Act (CEJA), which incentivizes renewable energy projects. According to Illinois law, county review of such projects is subject to a strict timeline, requiring a public hearing within 60 days of a complete application.

In addition to the special use permit, the commission recommended two variances from county code. The first increases the maximum allowed height for ground cover plants from 13 inches to 36 inches. The second reduces the required number of mowings from five times per year to just once. Staff reports indicated these variances are crucial for establishing a “pollinator-friendly solar site” under the Illinois Pollinator-Friendly Solar Site Act. The taller native vegetation and reduced mowing allow deep-rooted pollinator species to propagate, which helps recharge agricultural soils, improve water infiltration, and provide habitat for birds and insects.

The Village of New Lenox, whose corporate boundary is within 400 to 1,300 feet of the property, reviewed the project and did not object. However, the village board recommended five conditions for approval. These include meeting all county setback requirements, installing a concrete or asphalt surface for the access drive within the Spencer Road right-of-way, installing an eight-foot-tall Fixed Knot Farm fence, placing landscape screening along the western fence line, and abiding by all New Lenox Fire Protection District requirements.

The Forest Preserve District of Will County also submitted a letter with recommendations to mitigate environmental impacts. The district suggested installing wildlife-friendly fencing with a six-inch gap at the bottom to allow for animal movement, clearing trees only between November 1st and March 31st to protect wildlife, and using native quality plant species for landscaping.

According to the developer, the site will be remotely monitored 24/7, with employees only visiting occasionally for maintenance. The project is expected to create 20 to 25 local jobs during its estimated six-month construction phase, anticipated to begin in the fall of 2026. The developer has also entered into an Agricultural Impact Mitigation Agreement (AIMA) with the Illinois Department of Agriculture to ensure the preservation of the agricultural land and provide financial assurance for the eventual decommissioning of the facility.

Leave a Comment





Latest News Stories

Will County Board Graphic.04

County Approves Engineering for Peotone Road and Safety Upgrades

Will County Board Meeting | December 18, 2025 Article Summary: The County Board approved a Phase I engineering contract for improvements to Wilmington-Peotone Road and authorized an agreement for license...
U.S. Coast Guard broke records across the board in 2025

U.S. Coast Guard broke records across the board in 2025

By Bethany BlankleyThe Center Square (The Center Square ) – In 2025, the U.S. Coast Guard broke records across the board as the Trump administration poured an historic amount of...
Don’t count on lower electricity prices in 2026

Don’t count on lower electricity prices in 2026

By Lauren JessopThe Center Square For 67 million people relying on electricity from the regional power grid, PJM, cheaper utility bills in 2026 are little more than a pipe dream....
Screenshot 2025-12-20 at 12.27.11 PM

Lincoln-Way Board Approves $731,000 Freshman Laptop Purchase

Lincoln-Way Community High School District 210 Meeting | December 18, 2025 Article Summary: The District 210 Board of Education authorized the purchase of 1,750 Lenovo laptops to equip the incoming...
Will County Board Graphic.01

Monee Solar Farm Projects Granted Extensions

Will County Board Meeting | December 18, 2025 Article Summary: The Will County Board granted six-month extensions for two special use permits related to commercial solar energy facilities in Monee...

WATCH: Report: Americans are still paying off credit debt from last Christmas

By Carleen JohnsonThe Center Square If your last-minute Christmas shopping requires a credit card, you are not alone. According to a new WalletHub report, many Americans are still paying off...
Congressional Conflicts: Curb on lawmakers’ stock trades draws fire for being weak

Congressional Conflicts: Curb on lawmakers’ stock trades draws fire for being weak

By Mark StricherzThe Center Square A limited ban on stock trading by Congress might get a vote next year after a 2012 law did not do enough to stem the...
Wyoming's year in review: Education savings, contentious spending

Wyoming’s year in review: Education savings, contentious spending

By Andrew RiceThe Center Square Wyoming lawmakers passed legislation to expand education savings accounts and property tax protections in 2025. However, the legislature remained divided on substantial spending increases to...
Sufyan Farhan

Frankfort Man Arrested in Gas Station Robbery Found Hiding in McDonald’s Restroom

Article Summary: Sufyan Farhan, 27, was arrested on December 21 following an armed robbery at a Frankfort Circle K. Deputies located the suspect hiding in a nearby McDonald's restroom after...
U.S. House advances GOP-backed energy reliability bill

U.S. House advances GOP-backed energy reliability bill

By Elyse ApelThe Center Square Legislation looking to lower energy prices nationally successfully passed the U.S. House on a slightly bipartisan vote. H.R. 3628, titled the “State Planning for Reliability...
Illinois’ safe gun storage law goes into effect Jan. 1

Illinois’ safe gun storage law goes into effect Jan. 1

By Greg Bishop | The Center SquareThe Center Square (The Center Square) – Components of Illinois Safe Gun Storage Act go into effect Jan. 1. Supporters of Senate Bill 8,...
manhattan fire district graphic logo.1

Manhattan Fire Trustees Approve 2026 Budget and Tax Levy; Workers’ Comp Costs Jump 20%

Manhattan Fire Protection District Meeting | Nov. 17, 2025 Article Summary: The Manhattan Fire Protection District Board of Trustees adopted its budget and tax levy for the upcoming year while...
Meeting Briefs

Meeting Summary and Briefs: Will County Board Executive Committee for December 11, 2025

Will County Board Executive Committee Meeting | December 11, 2025 Overall Meeting SummaryThe Will County Board Executive Committee met on Thursday, December 11, 2025, tackling a diverse agenda that included...
Planning & Zoning Graphic.4

New Lenox Homeowner Granted Variance for 4,000-Square-Foot Accessory Space

Will County Planning and Zoning Commission Meeting | December 16, 2025 Article Summary: A New Lenox homeowner received approval to build a large pole barn that exceeds the county's size limits...
Meeting Briefs

Meeting Summary and Briefs: Manhattan Village Board for December 16, 2025

Manhattan Village Board Meeting | December 16, 2025 The Manhattan Village Board on Tuesday, Dec. 16, 2025, conducted a brief regular session focused on infrastructure maintenance and holiday community events....