Screenshot 2025-10-25 at 10.48.48 AM

New Lenox Solar Farm Proposal Advances with Conditions, Following Village and Forest Preserve Input

Spread the love

Will County Planning and Zoning Commission Meeting | October 21, 2025

Article Summary: The Will County Planning and Zoning Commission recommended approval for a 62.7-acre commercial solar energy facility in New Lenox Township, contingent on several conditions, including the development of an emergency response plan and adherence to landscaping requests from the Village of New Lenox. The project, proposed by Nexamp Solar LLC, aims to contribute to Illinois’ renewable energy goals under the Climate and Equitable Jobs Act (CEJA).

Spencer Road Solar Farm Key Points:

  • Project Scope: A special use permit was sought for a commercial solar energy facility on a 110-acre property on South Spencer Road, utilizing approximately 62.7 acres for two projects totaling 5.25 MW (AC).

  • Variances Approved: The commission also recommended variances to allow pollinator-friendly ground cover to grow up to 36 inches (from 13 inches) and to reduce the required number of mowings from five to one annually.

  • Local Input: The Village of New Lenox did not object but recommended conditions concerning setbacks, access drive surfacing, fencing, and landscape screening. The Forest Preserve District of Will County also provided recommendations to protect local wildlife.

  • State Law Compliance: The project falls under Illinois Public Law 102-1123, which sets specific parameters and timelines for counties to review commercial solar energy proposals.

JOLIET, IL – The Will County Planning and Zoning Commission on Tuesday, October 21, 2025, recommended approval for a large-scale commercial solar energy facility on approximately 62.7 acres of agricultural land in New Lenox Township. The recommendation, which now goes to the full Will County Board for a final decision, includes a special use permit and two variances aimed at promoting pollinator-friendly habitats on the site.

The project, proposed by developer Nexamp Solar LLC under the names Spencer Road Solar East LLC and Spencer Road Solar West LLC, involves constructing two adjacent solar facilities on a 110-acre property located on South Spencer Road, south of the Village of New Lenox. The combined facilities will feature approximately 12,029 solar panels on single-axis tracker systems, generating a total of 5.25 megawatts (AC).

The proposal is part of the state’s Adjustable Block program under the Climate and Equitable Jobs Act (CEJA), which incentivizes renewable energy projects. According to Illinois law, county review of such projects is subject to a strict timeline, requiring a public hearing within 60 days of a complete application.

In addition to the special use permit, the commission recommended two variances from county code. The first increases the maximum allowed height for ground cover plants from 13 inches to 36 inches. The second reduces the required number of mowings from five times per year to just once. Staff reports indicated these variances are crucial for establishing a “pollinator-friendly solar site” under the Illinois Pollinator-Friendly Solar Site Act. The taller native vegetation and reduced mowing allow deep-rooted pollinator species to propagate, which helps recharge agricultural soils, improve water infiltration, and provide habitat for birds and insects.

The Village of New Lenox, whose corporate boundary is within 400 to 1,300 feet of the property, reviewed the project and did not object. However, the village board recommended five conditions for approval. These include meeting all county setback requirements, installing a concrete or asphalt surface for the access drive within the Spencer Road right-of-way, installing an eight-foot-tall Fixed Knot Farm fence, placing landscape screening along the western fence line, and abiding by all New Lenox Fire Protection District requirements.

The Forest Preserve District of Will County also submitted a letter with recommendations to mitigate environmental impacts. The district suggested installing wildlife-friendly fencing with a six-inch gap at the bottom to allow for animal movement, clearing trees only between November 1st and March 31st to protect wildlife, and using native quality plant species for landscaping.

According to the developer, the site will be remotely monitored 24/7, with employees only visiting occasionally for maintenance. The project is expected to create 20 to 25 local jobs during its estimated six-month construction phase, anticipated to begin in the fall of 2026. The developer has also entered into an Agricultural Impact Mitigation Agreement (AIMA) with the Illinois Department of Agriculture to ensure the preservation of the agricultural land and provide financial assurance for the eventual decommissioning of the facility.

Leave a Comment





Latest News Stories

Committee-Executive.Graphic

Executive Committee: Tension Rises as Republican Whip Removed from Panel

Will County Executive Committee Meeting | February 11, 2026 Article Summary: A dispute over committee appointments erupted when Republican leadership challenged the removal of Member Vince Logan from the Executive...
Committee-Ad-Hoc.Graphic

Ad-Hoc Committee: County Stripped of Power to Regulate Motor Races, Must Drop Solicitor Fees Due to State Statutes

Will County Ad-Hoc Ordinance Review Committee Meeting | February 10, 2026 Article Summary: The Will County Board Ad-Hoc Ordinance Review Committee repealed county regulations regarding motor stunt events and removed...

Commission Overrides Staff Recommendation, Approves Manhattan Township Barn Expansion

Will County Planning and Zoning Commission Meeting | February 17, 2026 Article Summary: A Manhattan Township homeowner received unanimous approval for three variances to expand a pole barn, despite county...
Untitled design - 1

Manhattan-Elwood Library Board Approves Over $21,000 for Playroom Renovation and Picture Book Shelving

Manhattan-Elwood Public Library District Meeting | January 26, 2026 Article Summary: The Manhattan-Elwood Public Library District Board authorized over $21,000 in youth facility upgrades, funding a playroom renovation and the purchase...
Manhattan Township

Meeting Summary and Briefs: Manhattan Township for January 13, 2026

Manhattan Township Meeting | January 13, 2026 The Manhattan Township Board of Trustees held its regular monthly meeting on Tuesday evening to review administrative transitions, process grant paperwork, and approve...
Jackson Township Graphic.1 NEW

Jackson Township Board Approves Elwood Baseball Donation, Reviews Food Pantry Transition

Jackson Township Board Meeting | January 14, 2026 Article Summary: The Jackson Township Board approved a $1,000 donation to the Elwood Baseball & Softball Association and received an update on...
Meeting Briefs

Meeting Summary and Briefs: Village of Manhattan Board for February 17, 2026

Village of Manhattan Board Meeting | February 17, 2026 Overall Meeting SummaryThe Manhattan Village Board of Trustees met on Tuesday, February 17, 2026, to address infrastructure planning, intergovernmental cooperation, and...
Committee-Executive.Graphic

Executive Committee Advances “Project Northwinds”: 2,475 Jobs and $346 Million Investment Proposed for Former Caterpillar, Lion Electric Sites

Will County Executive Committee Meeting | February 11, 2026 Article Summary: The Will County Board Executive Committee moved forward a resolution supporting a massive manufacturing project that promises nearly 2,500...
Committee-Land Use.Graphic

Land Use Committee Advances Mokena Scrap Yard and Homer Glen Landscape Business Over Local Objections

Will County Land Use & Development Committee Meeting | February 5, 2026 Article Summary: The Will County Land Use Committee approved special use permits for two businesses in Frankfort and...
Screenshot 2026-03-22 at 12.12.19 PM

Manhattan School District 114 Honors Staff and First Responders Following Tragic Bus Accident

Manhattan School District 114 Meeting | February 11, 2026 Article Summary: Superintendent Dr. Damien Aherne publicly commended local first responders, district staff, and a Wilson Creek school counselor for their...
Screenshot 2026-02-22 at 4.29.56 PM

District 210 Reports Insurance Deficit Amid National Healthcare Cost Spikes; Finances Remain Stable

Lincoln-Way District 210 Board of Education Meeting | February 19, 2026 Article Summary: Assistant Superintendent Michael Duback reported a $630,000 deficit in the District’s medical plan performance for the 2025...
solar panels photovoltaics in solar farm

Planning Commission Backs 5-MW Peotone Solar Farm; Developer Pledges Pollinator Habitat and Community Funds

Will County Planning and Zoning Commission Meeting | February 17, 2026 Article Summary: The Will County Planning and Zoning Commission unanimously recommended approval for a new 5-megawatt commercial solar farm...
Screenshot 2026-02-22 at 5.06.42 PM

Joliet Junior College Board Approves $2 Tuition Increase Amidst Heated Debate Over Enrollment and Spending

Joliet Junior College Board of Trustees Meeting | February 18, 2026 Article Summary: The Joliet Junior College (JJC) Board of Trustees on Wednesday voted to increase tuition by $2 per...
Screenshot 2026-02-22 at 4.29.56 PM

Lincoln-Way Board Ratifies Three-Year Support Staff Contract with Significant Hourly Raises

Lincoln-Way District 210 Board of Education Meeting | February 19, 2026 Article Summary: The Lincoln-Way Community High School District 210 Board of Education ratified a new three-year collective bargaining agreement...
Manhattan Township

Manhattan Township Weighs Hall Rental Fee Increase to Cover Professional Cleaning Costs

Manhattan Township Meeting | January 13, 2026 Article Summary: Manhattan Township Supervisor James F. Walsh proposed adjusting the rental fees for the Township Hall to offset the newly introduced costs of...