Traffic Alert: Wolf Road water repairs rescheduled for Tuesday
MOKENA – Drivers traveling through Mokena should prepare for delays on Wolf Road tomorrow, as village officials have rescheduled planned water system repairs.
The Village of Mokena announced that the infrastructure work, originally slated for Monday, has been moved to Tuesday, Feb. 3. Crews will be performing repairs on the west side of Wolf Road, specifically along the stretch between Platner Drive and the Hickory Creek Bridge.
Work is scheduled to begin at approximately 9:00 a.m. and is expected to be completed by the end of the day.
During the repair operations, one lane of traffic will be temporarily closed in the area. While traffic flow will be maintained in both directions, officials warn that drivers should expect congestion.
The Village encourages motorists to utilize alternate routes if possible. Those who must travel through the work zone are advised to exercise increased caution to ensure the safety of the construction crews.
Latest News Stories
Illinois quick hits: Pope reacts to Pritzker bill signing
Study reveals top U.S. states for K-12 education
2025: More than 2.5 million removed, record number of violent offenders arrested
Trump to meet Zelensky in Florida Sunday
Construction Advances on New Manhattan Fire Station; Ambulance Repairs Scheduled
County Approves Engineering for Peotone Road and Safety Upgrades
U.S. Coast Guard broke records across the board in 2025
Don’t count on lower electricity prices in 2026
Lincoln-Way Board Approves $731,000 Freshman Laptop Purchase
Monee Solar Farm Projects Granted Extensions
WATCH: Report: Americans are still paying off credit debt from last Christmas
Congressional Conflicts: Curb on lawmakers’ stock trades draws fire for being weak