Executive Committee Advances $28.7 Million BNSF Bridge Project for Lorenzo Road
Will County Executive Committee Meeting | February 11, 2026
Article Summary: The Executive Committee approved an agreement with BNSF Railway to construct a grade separation bridge on Lorenzo Road in Wilmington. The railroad will contribute over $15 million toward the project and provide a one-time maintenance payment to the county.
Lorenzo Road Bridge Key Points:
-
Project: Construction of a grade separation bridge carrying Lorenzo Road (CH 80) over the BNSF Railroad tracks.
-
Location: 1.25 miles west of I-55 in County Board District 1.
-
Total Cost: The estimated total project cost is $28,717,523.80.
-
Railroad Contribution: BNSF will reimburse the county 100% of costs after the execution of ICC funds, up to a cap of $15,102,943.80.
-
Maintenance Fee: BNSF will pay Will County a one-time maintenance fee of $675,003.28 for the useful life of the overpass.
The Will County Board Executive Committee on Wednesday, February 11, 2026, approved Resolution 26-046, authorizing an agreement between the County and BNSF Railway for a major infrastructure project on Lorenzo Road.
The project involves constructing a bridge to separate the grade of Lorenzo Road (County Highway 80) from the BNSF rail line, located approximately 1.25 miles west of Interstate 55. The project aims to eliminate the at-grade crossing, improving safety and traffic flow in the heavy industrial corridor.
According to the agreement attached to the agenda, the total estimated cost of construction is $28,717,523.80. Under the terms of the deal, BNSF Railway will contribute significantly to the project. Once $12 million in Illinois Commerce Commission (ICC) funds are executed, BNSF will reimburse the county for remaining costs up to a cap of $15,102,943.80.
Additionally, the agreement stipulates that BNSF will provide a one-time lump sum payment of $675,003.28 to the county to cover future maintenance costs for the structure over its useful life. The county will be responsible for maintaining the roadway, bridge structure, and drainage.
The agreement requires the contractor to maintain strict safety clearances during construction, including 25 feet horizontally from the track centerline.
The measure was moved by Member Jacqueline Traynere and seconded by Member Denise Winfrey. It passed unanimously.
Latest News Stories
WATCH: Democrat state redistricting efforts created unfair advantages, lawmaker says
Illinois quick hits: Fatal helicopter crash; Comptroller orders another extra pension payment
Village Board Approves Comprehensive Update to Employee Personnel Manual
New poll: 50.2% of Illinois voters view Pritzker unfavorably
WATCH: Pritzker welcomes FBI looking for TX Dems in IL, dismisses bribery question
Manhattan Awards $537,907 Contract for Hanover Estates Road Resurfacing
WATCH: Illinois State Fair: Affordable fun backed by $140M in taxpayer funding
Op-Ed: State lawmakers gut Emmett Till Day bill, expose Illinois’ corruption problem
Democratic PACs being investigated for bankrolling AWOL Texas House Democrats
Pritzker: Chicago mayor ‘never once called’ to oppose pension bill
WATCH: Illinois In Focus Daily | Thursday Aug. 7th, 2025
Illinois quick hits: Cook County declares flood disaster; opt-out forms promoted; State Fair begins