Executive Committee Advances $28.7 Million BNSF Bridge Project for Lorenzo Road
Will County Executive Committee Meeting | February 11, 2026
Article Summary: The Executive Committee approved an agreement with BNSF Railway to construct a grade separation bridge on Lorenzo Road in Wilmington. The railroad will contribute over $15 million toward the project and provide a one-time maintenance payment to the county.
Lorenzo Road Bridge Key Points:
-
Project: Construction of a grade separation bridge carrying Lorenzo Road (CH 80) over the BNSF Railroad tracks.
-
Location: 1.25 miles west of I-55 in County Board District 1.
-
Total Cost: The estimated total project cost is $28,717,523.80.
-
Railroad Contribution: BNSF will reimburse the county 100% of costs after the execution of ICC funds, up to a cap of $15,102,943.80.
-
Maintenance Fee: BNSF will pay Will County a one-time maintenance fee of $675,003.28 for the useful life of the overpass.
The Will County Board Executive Committee on Wednesday, February 11, 2026, approved Resolution 26-046, authorizing an agreement between the County and BNSF Railway for a major infrastructure project on Lorenzo Road.
The project involves constructing a bridge to separate the grade of Lorenzo Road (County Highway 80) from the BNSF rail line, located approximately 1.25 miles west of Interstate 55. The project aims to eliminate the at-grade crossing, improving safety and traffic flow in the heavy industrial corridor.
According to the agreement attached to the agenda, the total estimated cost of construction is $28,717,523.80. Under the terms of the deal, BNSF Railway will contribute significantly to the project. Once $12 million in Illinois Commerce Commission (ICC) funds are executed, BNSF will reimburse the county for remaining costs up to a cap of $15,102,943.80.
Additionally, the agreement stipulates that BNSF will provide a one-time lump sum payment of $675,003.28 to the county to cover future maintenance costs for the structure over its useful life. The county will be responsible for maintaining the roadway, bridge structure, and drainage.
The agreement requires the contractor to maintain strict safety clearances during construction, including 25 feet horizontally from the track centerline.
The measure was moved by Member Jacqueline Traynere and seconded by Member Denise Winfrey. It passed unanimously.
Latest News Stories
Lincoln-Way Updates Student Handbook, Bans “Smart Glasses” to Combat AI Cheating
Meeting Summary and Briefs: Village of Manhattan for April 21, 2026
Will County Board Approves Tax Abatement Intent for “Project North Winds” Manufacturing Facility
Lincoln-Way West Softball Capitalizes on Errors to Shut Out Lincoln-Way Central 11-0
Illinois lawmaker warns medical records bill could delay care
‘Farm Bill’ may ease cost burden for farmers; Ag groups urge US Senate action
Indiana voters to decide compeititive congressional primary races Tuesday
U.S. debt tops 100% of GDP, ‘deeply troubling’ for economy, national security
Manhattan Renews Cash Rent Farmland Leases on Village-Owned Properties
U.S. troops in Italy, Spain hang in balance as troop reduction in Germany announced
Federal appeals court halts access to mail-order abortion drug
Labor unions back McCormick’s plan to reform federal permitting