lincoln way school district 210 logo.2

Lincoln-Way 210 Awards $1.98 Million Contract for Network Cabling Upgrades

Spread the love

Lincoln-Way Community High School District 210 Meeting | March 19, 2026

Article Summary: The Board of Education approved a $1.98 million contract with CDW/Greatline Solutions to upgrade aging wired infrastructure at the Central and East campuses to support modern technology and faster network speeds.

Cabling Upgrade Key Points:

  • A contract for a total cost of $1,982,901.00 was awarded to CDW/Greatline Solutions.

  • The project replaces 20-to-25-year-old CAT 5e cabling with CAT 6A, supporting up to 10 gigabits per second.

  • The district anticipates receiving $480,000 in reimbursements through the federal E-Rate program.

  • The new cabling comes with a 25-year manufacturer warranty.

The Lincoln-Way Community High School District 210 Board of Education on Thursday, March 19, 2026, unanimously approved a contract for a total cost of $1,982,901.00 with CDW/Greatline Solutions for a district-wide wired infrastructure upgrade.

The district issued a Request for Proposals (RFP) in January 2026 to upgrade components of its wired infrastructure through the federal E-Rate process. According to Director of Technology Cheryl Kay, much of the existing cabling at Lincoln-Way Central and East is 20 to 25 years old. The older CAT 5 and CAT 5e cabling standards do not support the faster speed capabilities of modern switching and wireless equipment recently purchased by the district.

“To put this into perspective for you, CAT 5e cabling supports speeds up to 1 gigabit per second, while CAT 6A cabling can support speeds up to 10 gigabits per second,” Kay explained to the Board. “I’ve used the garden hose versus the fire hose analogy in the past. So essentially, the new cabling allows more data to move through the network at one time.”

The upgraded infrastructure will also establish a foundation for future technology projects, including IP communication systems, digital signage, emergency alerting, and intercom systems that are nearing the end of their usable life.

The district received three proposals. While Netsource Solutions submitted a lower bid of $1,885,001.00, the district rejected it because the company only had 25 total employees. Kay noted that the district had significant concerns about a company of that size being able to complete the massive scope of work on time across multiple buildings. CDW/Greatline, a vendor the district has successfully used for past fiber projects, was selected instead.

The project is included in the district’s 5-year technology plan. Because a significant portion of the work qualifies for E-Rate reimbursements, the district anticipates receiving roughly $480,000 back after the project is completed. The installation work will be completed between April 1, 2026, and September 30, 2027, working around the district’s upcoming HVAC construction schedule.

Leave a Comment





Latest News Stories

Everyday Economics: Inflation squeezes household spending

Everyday Economics: Inflation squeezes household spending

By Orphe DivounguyThe Center Square The Fed held rates where they were – 3.5% to 3.75% – and nobody was surprised. What actually mattered was the friction inside the room....
Hurricane season month away; forecast modest

Hurricane season month away; forecast modest

By Alan WootenThe Center Square Six to nine hurricanes have been forecast in the Atlantic Basin hurricane season from June 1 to Nov. 30 by the two leading authorities. At...
Pentagon seeks $21B for barracks as repair backlog doubles

Pentagon seeks $21B for barracks as repair backlog doubles

By Brett RowlandThe Center Square The Pentagon is asking Congress for more than $21 billion for military barracks in its fiscal year 2027 budget request, the largest such investment in...

Lincoln-Way Updates Student Handbook, Bans “Smart Glasses” to Combat AI Cheating

Lincoln-Way Community High School District 210 Meeting | April 16, 2026 Article Summary: The Lincoln-Way Board of Education approved updates to the 2026-2027 student handbook, notably adding "smart glasses" to the...
Screenshot 2026-04-25 at 9.20.57 AM

Meeting Summary and Briefs: Village of Manhattan for April 21, 2026

Village of Manhattan Meeting | April 21, 2026 The Village of Manhattan Board of Trustees convened on Tuesday, April 21, 2026, to finalize the municipality's financial operations for the upcoming...
Will County Board Graphic.03

Will County Board Approves Tax Abatement Intent for “Project North Winds” Manufacturing Facility

Will County Board Meeting | April 16, 2026 Article Summary: The Will County Board signaled its intent to offer a 50% property tax abatement to "Project North Winds," a proposed...
Lincoln Way West Warriors Softball

Lincoln-Way West Softball Capitalizes on Errors to Shut Out Lincoln-Way Central 11-0

The Lincoln-Way West varsity softball team delivered a commanding 11-0 conference victory over cross-town rival Lincoln-Way Central on Friday afternoon, utilizing a relentless 13-hit attack and capitalizing heavily on the...
Illinois lawmaker warns medical records bill could delay care

Illinois lawmaker warns medical records bill could delay care

By Catrina Barker | The Center Square contributorThe Center Square (The Center Square) – State lawmakers are clashing over an Illinois proposal that would restrict how certain sensitive medical information...
‘Farm Bill’ may ease cost burden for farmers; Ag groups urge US Senate action

‘Farm Bill’ may ease cost burden for farmers; Ag groups urge US Senate action

By Sean ReedThe Center Square Many farm-focused organizations say they support a GOP-led legislative package on agriculture that narrowly passed through the U.S. House. The Illinois Farm Bureau has urged...
Indiana voters to decide compeititive congressional primary races Tuesday

Indiana voters to decide compeititive congressional primary races Tuesday

By Andrew RiceThe Center Square Indiana voters head to the polls Tuesday to elect party representatives in several competitive primary races. Across the Hoosier state, local political figures are seeking...
U.S. debt tops 100% of GDP, 'deeply troubling' for economy, national security

U.S. debt tops 100% of GDP, ‘deeply troubling’ for economy, national security

By Thérèse BoudreauxThe Center Square The U.S. national debt is now larger than the entire American economy and is only set to keep growing, further exacerbating the affordability crisis and...
Screenshot 2026-04-25 at 9.20.57 AM

Manhattan Renews Cash Rent Farmland Leases on Village-Owned Properties

Village of Manhattan Meeting | April 21, 2026 Article Summary: The Manhattan Village Board approved lease renewals for two village-owned agricultural parcels, generating over $15,000 in rental revenue for the upcoming...

U.S. troops in Italy, Spain hang in balance as troop reduction in Germany announced

By Sarah Roderick-FitchThe Center Square On the heels of President Donald Trump threatening to reduce troops in Europe, the Department of War announced Friday the reduction of 5,000 troops from...
Federal appeals court halts access to mail-order abortion drug

Federal appeals court halts access to mail-order abortion drug

By Dan McCalebThe Center Square A federal appeals court on Friday temporarily halted a Biden-era rule that allowed individuals to receive the abortion pill mifepristone through the mail without a...
Labor unions back McCormick’s plan to reform federal permitting

Labor unions back McCormick’s plan to reform federal permitting

By John ColeThe Center Square In a rare show of solidarity, building trade unions and U.S. Sen. Dave McCormick, R-Pa., want to streamline the federal permitting process so that projects...