Screenshot 2026-03-29 at 4.44.29 PM

Manhattan Approves Estimated $1.1 Million Resurfacing Project for Leighlinbridge Subdivision

Spread the love

Village of Manhattan Meeting | March 16, 2026

Article Summary: The Village of Manhattan approved a state resolution to secure Motor Fuel Tax funding for a major road resurfacing project targeting the Leighlinbridge Subdivision this summer.

Road Resurfacing Key Points:

  • The board unanimously approved an Illinois Department of Transportation (IDOT) resolution for maintenance under the Illinois Highway Code.

  • The 2026 project will focus exclusively on resurfacing streets within the Leighlinbridge Subdivision.

  • The project carries an estimated total cost of $1.1 million, funded through a mix of local and state dollars.

  • Specific streets slated for work include Carlow Circle, Celtic Circle, Leighlin Lane, and Ashford Street.

The Manhattan Village Board on Monday, March 16, 2026, officially greenlit the financing mechanism for its 2026 road resurfacing program, passing a resolution to utilize state Motor Fuel Tax (MFT) funds for extensive roadwork in the Leighlinbridge Subdivision.

The board unanimously approved the mandatory Illinois Department of Transportation (IDOT) “Resolution for Maintenance Under the Illinois Highway Code,” a required administrative step to legally authorize the expenditure of state-distributed MFT funds.

According to the engineering memo provided by Village Engineer Carrie Pintar, the 2026 resurfacing project is projected to cost an estimated $1.1 million. The village plans to utilize a $500,000 budget from its MFT reserves, paired with an estimated $600,000 from local municipal funds. The exact final figures will be determined once competitive construction bids are received and approved.

The comprehensive paving project will entirely focus on the Leighlinbridge Subdivision network. The specific roadways scheduled to be milled and resurfaced include:

  • Carlow Circle West (Celtic Circle to Ashford Street)

  • Carlow Circle East (Ashford Street to Celtic Circle)

  • Celtic Circle (Ashford Street to Ashford Street)

  • Leighlin Lane (Carlow Circle to Gougar Road)

  • Ashford Street (Celtic Circle to Sweedler Road)

Engineering costs for the project will follow standard IDOT rates, with preliminary design engineering accounting for 5% of the construction cost, and construction observation and material testing accounting for 6%.

The resolution passed smoothly via a unanimous roll call vote without debate.

Leave a Comment





Latest News Stories

Meeting Briefs

Meeting Summary and Briefs: Jackson Township Board September 2025

Meeting Summary and Briefs: Jackson Township Board Meeting | September 10, 2025 The Jackson Township Board met on Wednesday, September 10, 2025, to handle standard monthly business, including the approval...
Screenshot 2025-10-17 at 11.46.09 AM

Manhattan Seeks $250,000 State Grant for Safe Routes to School Program

Village of Manhattan Board Meeting - October 7, 2025 Article Summary: The Village of Manhattan is applying for a grant of up to $250,000 from the Illinois Department of Transportation's...
Screenshot 2025-10-17 at 11.31.38 AM

Lincoln-Way Board Honors Students with Perfect ACT Scores, Music Educator of the Year

LW210 Board of Education Meeting | October 16, 2025 Article Summary: Lincoln-Way District 210 celebrated exceptional academic and faculty achievement by formally recognizing nine students who earned a perfect composite...
Screenshot 2025-10-17 at 11.59.49 AM

Manhattan 114 Reviews Fall Student Benchmark Data, Sees Strong Growth

Manhattan School District 114 Board Meeting | October 8, 2025 Article Summary: Manhattan School District 114's Director of Curriculum and Instruction presented the board with fall benchmark data, showing that...
Screenshot 2025-10-17 at 11.46.03 AM

Public Hearing for 41-Home Butternut Ridge South Subdivision Continued in Manhattan

Village of Manhattan Board Meeting - October 7, 2025 Article Summary: The Manhattan Village Board opened a public hearing for the annexation of the proposed Butternut Ridge South development but...
Screenshot 2025-10-17 at 11.32.04 AM

Lincoln-Way Support Staff Union Rejects Tentative Contract Agreement

LW210 Board of Education Meeting | October 16, 2025 Article Summary: Members of the Lincoln-Way Community High School District 210 support staff union have voted down a tentative five-year contract...
Jackson Township Graphic.2 NEW

Highway Commissioner Reports on Equipment Updates and Millsdale Road Closure

Meeting Summary and Briefs: Jackson Township Board Meeting | September 10, 2025 Article Summary: Highway Commissioner Walsh provided updates on department equipment and road projects during the September 10 board...
Meeting Briefs

Meeting Summary and Briefs: Will County Board Legislative Committee for October 7, 2025

The Will County Legislative Committee held a long and contentious meeting on Tuesday, October 7, 2025, highlighted by the narrow 4-3 passage of a controversial resolution supporting protections for immigrant...
Screenshot 2025-10-17 at 11.59.44 AM

Parents, Mayor Raise Concerns Over Special Education Services at Manhattan 114 Board Meeting

Manhattan School District 114 Board Meeting | October 8, 2025 Article Summary: Parents of a special needs student, supported by a statement from Manhattan's mayor, addressed the Manhattan School District...
Screenshot 2025-10-17 at 11.41.05 AM

Manhattan Awards Over $1.3 Million in Bids for Major Water Main Upgrades

Village of Manhattan Board Meeting - October 7, 2025 Article Summary: The Manhattan Village Board awarded three separate contracts totaling over $1.38 million for significant water infrastructure projects, including improvements...
Screenshot 2025-10-10 at 12.05.55 PM

Will County Board Committee Passes Contentious ‘Live and Work Without Fear’ Resolution on 4-3 Vote

Will County Legislative Committee Meeting October 7, 2025 Article Summary: The Will County Legislative Committee on Tuesday narrowly passed a controversial resolution affirming the county's commitment to ensuring all residents...
Meeting Briefs

Will County Awards $10.4 Million Contract for Bell Road Widening in Homer Glen Area

Will County Public Works & Transportation Committee Meeting October 7, 2025 Article Summary: The Will County Public Works & Transportation Committee on Tuesday confirmed the award of a $10.4 million...
Manhattan Township

Manhattan Township to Set Solar Farm Rules Amid Concerns with Area Projects

Manhattan Township Meeting | September 9, 2025 Article Summary: Manhattan Township will hold a special meeting to establish guidelines for solar energy facilities after officials reported significant construction-related problems at...
Screenshot 2025-10-10 at 12.12.16 PM

Meeting Summary and Briefs: Will County Public Works & Transportation Committee for October 7, 2025

The Will County Public Works & Transportation Committee on Tuesday, October 7, 2025, approved a major construction contract and reviewed extensive plans for both county and state transportation initiatives. The...
Meeting Briefs

Meeting Summary and Briefs: Will County Board Finance Committee for October 7, 2025

The Will County Finance Committee on Tuesday, October 7, 2025, held a contentious meeting centered on the county’s finances, narrowly approving a preliminary $161.6 million county-wide tax levy on a...