Will County Board Graphic.03

Will County Approves $2.9 Million Engineering Contract for Bluff Road Reconstruction in Channahon

Spread the love

Will County Public Works & Transportation Committee Meeting | April 7, 2026

Article Summary: The county is advancing a massive overhaul of Bluff Road in Channahon, approving a nearly $3 million Phase I and II engineering contract to prepare the corridor for full reconstruction, storm sewers, and potential retaining walls.

Bluff Road Engineering Key Points:

  • The committee approved a $2,955,607 contract with Peralte-Clark, LLC.

  • The project covers Bluff Road (CH 77) from the I-55 West Frontage Road to US Route 6.

  • The design will convert the existing rural, ditch-lined road into an urban cross-section with curb, gutter, and storm sewers.

  • The contract includes extensive geotechnical and environmental investigations due to the likelihood of encountering shallow bedrock and utility conflicts.

The Will County Board Public Works & Transportation Committee on Tuesday, April 7, 2026, unanimously approved a sweeping $2,955,607 professional services agreement with Peralte-Clark, LLC to engineer the total reconstruction of Bluff Road in Channahon.

The project targets a 5,900-foot, 1.1-mile stretch of Bluff Road (County Highway 77) between US Route 6 and the West Frontage Road of Interstate 55. Currently a two-lane major collector carrying roughly 5,850 vehicles per day, the roadway suffers from pavement deterioration, geometric deficiencies, and drainage issues.

According to the project scope detailed in the agenda packet, Peralte-Clark will guide the project through both Phase I (Preliminary & Environmental Engineering) and Phase II (Design Engineering). The ultimate goal is to convert the existing rural cross-section—characterized by aggregate shoulders and open ditches—into a modernized urban section featuring concrete curbs, gutters, and an enclosed storm sewer system.

The engineering task is highly complex due to the corridor’s specific geography. The contract includes significant subsurface investigations by subconsultants to identify areas of shallow bedrock, which could severely impact drainage design, excavation costs, and the placement of proposed retaining walls.

The Phase I study will evaluate up to four geometric alternatives, including two-lane and three-lane configurations, while also designing pedestrian and bicycle accommodations. The engineering team will also be required to navigate substantial utility conflicts, requiring a dedicated Subsurface Utility Engineering (SUE) evaluation.

The $2.95 million contract will be funded through a combination of County Motor Fuel Tax, RTA Tax, Highway Tax, and Matching Tax funds. According to the preliminary schedule, Phase II design is slated for completion by March 2027, with construction potentially beginning in June 2027.

Leave a Comment





Latest News Stories

Will County Board Graphic.03

County Expands Paratransit Services, Board Members Question Long-Term Funding

Will County Board Meeting | December 18, 2025 Article Summary: The Will County Board approved an intergovernmental agreement with Pace to expand paratransit services county-wide for seniors and residents with...
California attorney general joins coalition to protect trans youth in sports

California attorney general joins coalition to protect trans youth in sports

By Esther Wickham | The Center SquareThe Center Square (The Center Square) – California Attorney General Rob Bonta joined 12 Democratic attorneys general on Tuesday, submitting an amicus brief opposing...
Supreme Court blocks National Guard deployment to Chicago

Supreme Court blocks National Guard deployment to Chicago

By Brett Rowland | The Center SquareThe Center Square (The Center Square) – The U.S. Supreme Court ruled Tuesday that President Donald Trump can't use National Guard troops in Chicago...
Chicago mayor refuses to sign or veto budget at 'not a campaign event'

Chicago mayor refuses to sign or veto budget at ‘not a campaign event’

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – A new Chicago budget is set to take effect, even though the city’s mayor refused to sign...
Illinois quick hits: DOJ sues over sanctuary expansion law

Illinois quick hits: DOJ sues over sanctuary expansion law

By Jim Talamonti | The Center SquareThe Center Square DOJ sues over sanctuary expansion law The U.S. Department of Justice has filed a lawsuit against Illinois Gov. J.B. Pritzker and...
Meeting Briefs

Meeting Summary and Briefs: Joliet Junior College Board for Dec. 10, 2025

Joliet Junior College Board Meeting | Dec. 10, 2025 Meeting Summary The Joliet Junior College Board of Trustees met on Wednesday, December 10, 2025, for a meeting marked by both...
Screenshot 2025-12-20 at 12.26.58 PM

District 210 Awards $24.4 Million Contract for Major HVAC Upgrades

Lincoln-Way Community High School District 210 Meeting | December 18, 2025 Article Summary: The District 210 Board of Education awarded a $24.4 million bid to BEAR Construction Company for comprehensive...
IL Medicaid overhaul effective Jan. 1 sparks backlash

IL Medicaid overhaul effective Jan. 1 sparks backlash

By Catrina Barker | The Center Square contributorThe Center Square (The Center Square) – A sweeping Medicaid and maternal-care overhaul taking effect Jan. 1 draws sharp criticism from Illinois Republicans,...
Illinois quick hits: Man convicted of drug money laundering; human trafficking arrests made

Illinois quick hits: Man convicted of drug money laundering; human trafficking arrests made

By Jim Talamonti | The Center SquareThe Center Square Man convicted of drug money laundering A federal jury in Chicago has convicted a man of laundering cash proceeds from a...
Will County Board Graphic.02

Mental Health Board Updates Committee on 2026 Grant Cycle and Funding Priorities

Will County Board Executive Committee Meeting | December 11, 2025 Article Summary: The Will County Community Mental Health Board provided a quarterly update, outlining the timeline and strategic priorities for...
Screenshot 2025-12-20 at 11.39.07 AM

Manhattan Board Finalizes Round Barn Annexation, Sets New Year’s Eve Ball Drop

Manhattan Village Board Meeting | December 16, 2025 Article Summary: The Manhattan Village Board on Tuesday, Dec. 16, 2025, approved minutes formalizing the annexation of the Manhattan Park District’s Round...
Will County P&Z Logo Planning Zoning

PZC Approves Homer Township Landscape Business Despite Neighbor Concerns; Adds Berm Condition

Will County Planning and Zoning Commission Meeting | December 16, 2025 Article Summary: The Will County Planning and Zoning Commission approved a special use permit for a new landscape business on...

JJC Foundation Executive Director Retires Following $2.3 Million Estate Gift

Joliet Junior College Board Meeting | Dec. 10, 2025 Article Summary: Longtime Joliet Junior College Foundation Executive Director Kristi Mulvey announced her retirement at her final board meeting, capping a...
Screenshot 2025-12-20 at 12.25.51 PM

Lincoln-Way Board Approves $92.5 Million Tax Levy for 2025

Lincoln-Way Community High School District 210 Meeting | December 18, 2025 Article Summary: The Lincoln-Way Community High School District 210 Board of Education officially adopted a $92,522,000 tax levy during...
Chicago council, 'starting to legislate,' sends $16.7 billion budget to mayor

Chicago council, ‘starting to legislate,’ sends $16.7 billion budget to mayor

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – The Chicago City Council has approved a $16.7 billion budget for 2026 and sent it to Mayor...