Will County Board Graphic.03

Will County Approves $2.9 Million Engineering Contract for Bluff Road Reconstruction in Channahon

Spread the love

Will County Public Works & Transportation Committee Meeting | April 7, 2026

Article Summary: The county is advancing a massive overhaul of Bluff Road in Channahon, approving a nearly $3 million Phase I and II engineering contract to prepare the corridor for full reconstruction, storm sewers, and potential retaining walls.

Bluff Road Engineering Key Points:

  • The committee approved a $2,955,607 contract with Peralte-Clark, LLC.

  • The project covers Bluff Road (CH 77) from the I-55 West Frontage Road to US Route 6.

  • The design will convert the existing rural, ditch-lined road into an urban cross-section with curb, gutter, and storm sewers.

  • The contract includes extensive geotechnical and environmental investigations due to the likelihood of encountering shallow bedrock and utility conflicts.

The Will County Board Public Works & Transportation Committee on Tuesday, April 7, 2026, unanimously approved a sweeping $2,955,607 professional services agreement with Peralte-Clark, LLC to engineer the total reconstruction of Bluff Road in Channahon.

The project targets a 5,900-foot, 1.1-mile stretch of Bluff Road (County Highway 77) between US Route 6 and the West Frontage Road of Interstate 55. Currently a two-lane major collector carrying roughly 5,850 vehicles per day, the roadway suffers from pavement deterioration, geometric deficiencies, and drainage issues.

According to the project scope detailed in the agenda packet, Peralte-Clark will guide the project through both Phase I (Preliminary & Environmental Engineering) and Phase II (Design Engineering). The ultimate goal is to convert the existing rural cross-section—characterized by aggregate shoulders and open ditches—into a modernized urban section featuring concrete curbs, gutters, and an enclosed storm sewer system.

The engineering task is highly complex due to the corridor’s specific geography. The contract includes significant subsurface investigations by subconsultants to identify areas of shallow bedrock, which could severely impact drainage design, excavation costs, and the placement of proposed retaining walls.

The Phase I study will evaluate up to four geometric alternatives, including two-lane and three-lane configurations, while also designing pedestrian and bicycle accommodations. The engineering team will also be required to navigate substantial utility conflicts, requiring a dedicated Subsurface Utility Engineering (SUE) evaluation.

The $2.95 million contract will be funded through a combination of County Motor Fuel Tax, RTA Tax, Highway Tax, and Matching Tax funds. According to the preliminary schedule, Phase II design is slated for completion by March 2027, with construction potentially beginning in June 2027.

Leave a Comment





Latest News Stories

Will County Board Land Use Committee Graphic.3

County Board Members Pitch “Granny Flats,” Hobby Farm Zoning, and Farmland Mitigation in LRMP Brainstorm

Will County Board Land Use & Development Committee Meeting | March 26, 2026 Article Summary: During a brainstorming workshop for the county's new Land Resource Management Plan, Will County Board...
Screenshot 2026-03-29 at 4.21.41 PM

Meeting Summary and Briefs: Manhattan School District 114 for March 25, 2026

Manhattan School District 114 Meeting | March 25, 2026 The Manhattan School District 114 Board of Education held a special meeting on Wednesday, March 25, 2026, to address time-sensitive capital...
Hyundai Translead

Will County Board Approves Tax Abatement for $345 Million Hyundai Translead Project

Will County Board Meeting | March 19, 2026 Article Summary: The Will County Board has authorized an agreement of intent to abate taxes for a massive $345 million manufacturing project...
lincoln way school district 210 logo.2

Lincoln-Way 210 Advances Summer Site Improvements and Asbestos Abatement Projects

Lincoln-Way Community High School District 210 Meeting | March 19, 2026 Article Summary: The Board of Education approved an asbestos abatement contract and initial site improvement bids to prepare for...
Lawmaker criticizes surplus spending bill

Lawmaker criticizes surplus spending bill

By Catrina Baker | The Center Square contributorThe Center Square (The Center Square) – A proposal aimed at helping local governments manage retiree health care costs is drawing differing views...
Screenshot 2026-03-29 at 4.21.41 PM

Manhattan District 114 Board Abates $252,430 from 2025 Bond and Interest Levy

Manhattan School District 114 Meeting | March 25, 2026 Article Summary: Utilizing finalized property value estimates from the county, the Manhattan School District 114 Board of Education approved a levy abatement...
Screenshot 2026-03-29 at 4.44.29 PM

Manhattan Approves Estimated $1.1 Million Resurfacing Project for Leighlinbridge Subdivision

Village of Manhattan Meeting | March 16, 2026 Article Summary: The Village of Manhattan approved a state resolution to secure Motor Fuel Tax funding for a major road resurfacing project targeting...
Salvation Army rehab ‘enrollees’ who work at thrift stores aren’t ‘employees’

Salvation Army rehab ‘enrollees’ who work at thrift stores aren’t ‘employees’

By Jonathan Bilyk | Legal NewslineThe Center Square A few days after agreeing to let them proceed with their class action against one of America's most prominent charities under labor...
Illinois housing affordability efforts pit tax cuts against new spending

Illinois housing affordability efforts pit tax cuts against new spending

By Sean Reed | The Center SquareThe Center Square (The Center Square) – As homeownership may be growing out of reach for many young residents, Illinois lawmakers are split between...
Illinois Quick Hits: Chicago city workers owe more than $19M

Illinois Quick Hits: Chicago city workers owe more than $19M

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – Chicago city workers reportedly owe more than $19 million in traffic tickets, water bills and fines, yet...
Screenshot 2026-05-05 at 1.39.16 PM

JJC Board Prepares for 2028 Bond Expiration, Advances Grundy Campus Despite Objections

Joliet Junior College Board of Trustees Meeting | March 11, 2026 Article Summary: Joliet Junior College is laying the groundwork for a potential future referendum and advancing its Grundy County expansion...
Attorney expects conversion therapy ruling to impact Illinois ban

Attorney expects conversion therapy ruling to impact Illinois ban

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – Illinois’ ban on conversion therapy may be challenged in the near future. Last week, the U.S. Supreme...
Millionaire’s tax proposal draws mixed reviews as deadline approaches

Millionaire’s tax proposal draws mixed reviews as deadline approaches

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – Supporters of a 3% surcharge on income more than $1 million have less than a month to...
Universities warn state funding delays are wasting millions in taxpayer investment

Universities warn state funding delays are wasting millions in taxpayer investment

By Sean Reed | The Center SquareThe Center Square (The Center Square) – Long‑delayed university repair funding is leaving campuses across the state with holes in their roofs, and in...
Illinois Quick Hits: Loyola student's alleged killer faces federal firearm charge

Illinois Quick Hits: Loyola student’s alleged killer faces federal firearm charge

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – An 18-year-old Loyola University student’s accused killer has also been charged with illegal possession of a firearm....