Will County Board Graphic.03

Will County Approves $2.9 Million Engineering Contract for Bluff Road Reconstruction in Channahon

Spread the love

Will County Public Works & Transportation Committee Meeting | April 7, 2026

Article Summary: The county is advancing a massive overhaul of Bluff Road in Channahon, approving a nearly $3 million Phase I and II engineering contract to prepare the corridor for full reconstruction, storm sewers, and potential retaining walls.

Bluff Road Engineering Key Points:

  • The committee approved a $2,955,607 contract with Peralte-Clark, LLC.

  • The project covers Bluff Road (CH 77) from the I-55 West Frontage Road to US Route 6.

  • The design will convert the existing rural, ditch-lined road into an urban cross-section with curb, gutter, and storm sewers.

  • The contract includes extensive geotechnical and environmental investigations due to the likelihood of encountering shallow bedrock and utility conflicts.

The Will County Board Public Works & Transportation Committee on Tuesday, April 7, 2026, unanimously approved a sweeping $2,955,607 professional services agreement with Peralte-Clark, LLC to engineer the total reconstruction of Bluff Road in Channahon.

The project targets a 5,900-foot, 1.1-mile stretch of Bluff Road (County Highway 77) between US Route 6 and the West Frontage Road of Interstate 55. Currently a two-lane major collector carrying roughly 5,850 vehicles per day, the roadway suffers from pavement deterioration, geometric deficiencies, and drainage issues.

According to the project scope detailed in the agenda packet, Peralte-Clark will guide the project through both Phase I (Preliminary & Environmental Engineering) and Phase II (Design Engineering). The ultimate goal is to convert the existing rural cross-section—characterized by aggregate shoulders and open ditches—into a modernized urban section featuring concrete curbs, gutters, and an enclosed storm sewer system.

The engineering task is highly complex due to the corridor’s specific geography. The contract includes significant subsurface investigations by subconsultants to identify areas of shallow bedrock, which could severely impact drainage design, excavation costs, and the placement of proposed retaining walls.

The Phase I study will evaluate up to four geometric alternatives, including two-lane and three-lane configurations, while also designing pedestrian and bicycle accommodations. The engineering team will also be required to navigate substantial utility conflicts, requiring a dedicated Subsurface Utility Engineering (SUE) evaluation.

The $2.95 million contract will be funded through a combination of County Motor Fuel Tax, RTA Tax, Highway Tax, and Matching Tax funds. According to the preliminary schedule, Phase II design is slated for completion by March 2027, with construction potentially beginning in June 2027.

Leave a Comment





Latest News Stories

Will County Finance Logo

Meeting Summary and Briefs: Finance Committee for February 3, 2026

Finance Committee Meeting | February 3, 2026 The Will County Finance Committee met on Tuesday, February 3, 2026, to address critical facility needs and review the county's financial standing. The...
Will County P&Z Logo Planning Zoning

Fairmont Neighborhood Plan Update Prioritizes Infrastructure and Beautification Following Demographic Shift

Planning and Zoning Commission Meeting | February 3, 2026 Article Summary: The Will County Planning and Zoning Commission unanimously approved an update to the Fairmont Neighborhood Plan, addressing significant demographic...
Will County Board Graphic.04

Health & Safety Committee: Monee Church Kitchen Project Highlighted in County Health Impact Report

Public Health & Safety Committee Meeting | February 5, 2026 Article Summary: The Will County MAPP Collaborative presented its impact report, highlighting ARPA-funded community kitchen projects in Monee and Joliet...
Screenshot 2026-02-04 at 2.03.49 PM

State of the College: President Namuo Pushes for Bachelor’s Degrees, Cites Record Graduation Rates

Joliet Junior College State of the College | February 4, 2026 Article Summary: JJC President Dr. Clyne Namuo highlighted the college’s legislative push to offer bachelor's degrees in applied fields...
Will County Finance Logo

Emergency Freezer Replacement Approved for Adult Detention Facility

Finance Committee Meeting | February 3, 2026 Article Summary: The committee authorized an emergency expenditure of $155,000 to replace a failed walk-in freezer system at the Adult Detention Facility (ADF)....
Will County Board Graphic.01

Meeting Summary and Briefs: Legislative Committee for February 3, 2026

Legislative Committee Meeting | February 3, 2026 The Will County Legislative Committee convened on Tuesday, February 3, 2026, to finalize its federal priorities and receive updates on state and national...
Will County Board Graphic.01

Health & Safety Committee: Opioid Overdose Deaths Drop to Zero in January as Behavioral Health Department Expands Role

Public Health & Safety Committee Meeting | February 5, 2026 Article Summary: The Will County Health Department reported a significant decline in opioid overdose deaths, recording zero fatalities in January...
Joliet Junior College Graphic.5

State of the College: JJC Announces Plans for New Campus in Grundy County

Joliet Junior College State of the College | February 4, 2026 Article Summary: During his State of the College address, Joliet Junior College (JJC) President Dr. Clyne Namuo announced the...
Meeting Briefs

Meeting Summary and Briefs: Manhattan Village Board for Feb. 3, 2026

Manhattan Village Board Meeting | Feb. 3, 2026 The Manhattan Village Board met on Tuesday, February 3, 2026, with all trustees present, including Trustees Jennifer Bahena, Justin Young, Robert Dilling,...
Meeting Briefs

Meeting Summary and Briefs: Public Works & Transportation Committee for February 3, 2026

Public Works & Transportation Committee Meeting | February 3, 2026 The Will County Public Works and Transportation Committee met on Tuesday, February 3, 2026, to approve various infrastructure investments and...
Will County Board Graphic.03

Health & Safety Committee: District 3 Board Member Pushes for Expanded Animal Control Services in Monee, Crete

Public Health & Safety Committee Meeting | February 5, 2026 Article Summary: Will County Board Member Daniel J. Butler (District 3) urged Animal Protection Services to establish intergovernmental agreements with...
Meeting Briefs

Meeting Summary and Briefs: Will County Capital Improvements & IT Committee for Jan. 6, 2026

Will County Capital Improvements & IT Committee Meeting | Jan. 6, 2026 The Will County Board Capital Improvements and IT Committee met Tuesday, Jan. 6, 2026, to discuss the county's...
Will County Board Graphic.04

Legislative Committee: Lobbyists Report on Federal Shutdown and Legislative Outlook

Legislative Committee Meeting | February 3, 2026 Article Summary: Federal lobbyists provided the Legislative Committee with an update on the partial government shutdown and the status of appropriations bills. While...
Will County Finance Logo

County Authorizes Financial Study of Homer Glen Law Enforcement Contract

Finance Committee Meeting | February 3, 2026 Article Summary: The Finance Committee voted to authorize a professional study to evaluate the true cost of providing law enforcement services to the...
Meeting Briefs

Meeting Summary and Briefs: Joliet Junior College Board of Trustees Workshop for January 28, 2026

JJC Trustees Workshop Meeting | January 28, 2026 The Joliet Junior College Board of Trustees convened for a workshop session on Wednesday to discuss the institution's long-term financial health and...