Will County P&Z Logo Planning Zoning.2

Zinc Leaching and Flooding Concerns Dominate Testimony at Will County Solar Hearing

Spread the love

Will County Board Special Planning and Zoning Commission Meeting | May 12, 2026

Article Summary: Expert and resident testimonies during Tuesday’s Planning and Zoning Commission meeting highlighted severe concerns over groundwater contamination and flooding if a 6,000-acre solar farm is built on hydric soils.

Environmental Impact Key Points:

  • A Will-South Cook Soil and Water Conservation District report (NRI #5824) classified the site as “essential farmland” with a LESA score of 236.

  • Approximately 2,152 acres of the proposed site contain hydric soils that present a high risk for steel corrosion.

  • A foundation drilling expert testified that driving raw galvanized steel posts into hydric soil could cause rapid corrosion, risking zinc leaching into local aquifers.

  • Residents from Green Garden Township presented video evidence of existing severe flooding on parcels adjacent to the proposed solar arrays.

A debate over soil chemistry, galvanized steel, and floodplains took center stage at the Will County Planning and Zoning Commission on Tuesday, May 12, 2026, as residents and experts warned of potential environmental disasters from the proposed Earthrise solar project.

During the court-ordered cross-examination hearing, plaintiffs focused heavily on Natural Resource Information Report #5824, prepared by the Will-South Cook Soil and Water Conservation District. The report calculated a Land Evaluation and Site Assessment (LESA) score of 236 for the property—classifying it as essential farmland—and noted that approximately 2,152 acres of the site consist of hydric soils.

Crucially, the report indicated that the site presents a “high” risk for steel corrosion. Plaintiff Attorney Steven Becker questioned Earthrise developers on their plan to drive an estimated 300,000 bare galvanized steel posts into the ground to support the 1.19 million solar modules.

To support the plaintiffs’ claims, Melissa Eager, an operating engineer with 30 years of experience in the caisson drilling industry, testified about the dangers of placing untreated steel into wet soils.

“Anything put into ground that is wet is going to eventually leach out,” Eager testified. “A pinhole into that galvanization will corrode… when put in a hydric soil or wet locations it’s usually anywhere from 3 to 5 years.”

Eager suggested that the posts should be coated in epoxy or encased in concrete. However, she warned that using heavy machinery to encase thousands of posts in concrete would heavily compact the area’s silty loam soil, creating a “hard pan” that would drastically increase surface erosion and water runoff.

Earthrise Lead Developer Robert Kalbouss and attorney Ben Jacobi refuted the claims, relying on prior testimony from their environmental scientist, Dr. Chris Olsen. Jacobi stated that any leaching from the galvanized steel would be minimal and isolated directly next to the pile, posing no threat to crops or groundwater.

“There is no evidence of or documented evidence of steel piles from solar facilities leaching into the groundwater. It doesn’t exist,” Jacobi said. “We don’t believe that our construction methods pose a risk to public health or agriculture.”

The potential for exacerbated runoff struck a nerve with neighboring property owners. Green Garden Township residents Jim Michalewicz and Donna Robinson presented photographs and video footage showing substantial standing water and flooding on their properties, which abut the proposed solar parcels.

Robinson showed video of her yard flooding on three sides, noting that neighboring landowners had failed to maintain culverts, causing water to back up onto her property. She expressed deep concern that industrial development on the adjacent fields would push even more water into her yard.

Becker underscored these concerns, pointing out that the Earthrise project footprint sits near the headwaters of Fork Creek, Prairie Creek, and Hickory Creek. He warned the commission that any groundwater contamination could easily travel into these tributaries, potentially violating the federal Clean Water Act.

Leave a Comment





Latest News Stories

New-Lenox-School-122.5

D122 to Spend $24,950 on Professional Enrollment Forecast

New Lenox School District 122 will hire an outside firm to conduct a comprehensive, 10-year enrollment forecast at an estimated cost of $24,950. The Board of Education approved an agreement...
Police blue and red flashing light on the car in the street

Manhattan Police Report

Disclaimer: Charges against each defendant are merely an accusation, with all defendants presumed innocent unless proven guilty in a court of law. On June 25th, officers stopped Jr. Vrabel, Daniel (44) of Joliet, Illinois...
JJC-Graphic-Logo

JJC Trustees Approve Contentious FY26 Budget After Heated Debate, Failed Postponement

The Joliet Junior College Board of Trustees on Wednesday approved a $322.3 million budget for fiscal year 2026, but not before a tense debate that saw a motion to postpone...
Screenshot 2025-07-06 at 9.50.39 AM

Lincoln Way District 210 Approves $2.1 Million Budget Amendment, Maintains Strong Financial Position

Lincoln Way Community High School District 210 board members unanimously approved an amended fiscal year 2025 budget Thursday night that increases the district's operating surplus to $2.1 million while maintaining...
Joliet-Junior-college.-Graphic-Logo.5

JJC’s ‘12x12x12’ Initiative Boosts College Credits, Increases Matriculation Rate

Joliet Junior College’s ambitious "12x12x12" initiative is yielding significant results, leading to more high school students earning college credits and a greater percentage of them choosing to attend JJC after...
Screenshot 2025-07-06 at 9.45.35 AM

District 210 Approves Administrative Restructuring, Staff Salary Increases

Lincoln Way Community High School District 210 board members approved administrative restructuring and salary increases for non-union clerical support staff during closed session actions Thursday night. The board unanimously approved...
Joliet-Junior-college.-Graphic-Logo.4

JJC Board Meeting Highlights Tensions Over Legal Bills, Trustee Conduct

An otherwise routine vote to approve monthly bill payments ignited a tense exchange at the Joliet Junior College Board of Trustees meeting Wednesday, revealing ongoing friction over redacted legal invoices,...
Joliet-Junior-college.-Graphic-Logo.3

Students, Trustees Emphasize Importance of Inclusivity and Flag Raisings at JJC

From a recent graduate’s public plea to trustee remarks on federal policies, the theme of student belonging and inclusivity was a prominent thread at the Joliet Junior College Board of...
Meeting Briefs

L-W School Board June 26 Meeting Briefs

Special Education District Update: The fence installation around the playground at Lincoln Way Area Special Education District 843 has been completed except for one gate section that will allow equipment...
Joliet-Junior-college.-Graphic-Logo.2

JJC Embarks on New 10-15 Year Facilities Master Plan Process

Joliet Junior College is laying the groundwork for its physical future, officially launching a comprehensive process to create a new facilities master plan that will guide campus development for the...
Meeting Briefs

Meeting Summary: Joliet Junior College Board of Trustees for June 25, 2025

The Joliet Junior College Board of Trustees met on Wednesday, June 25, 2025. Key actions included the approval of the fiscal year 2026 budget after a contentious debate and hearing...
Will-County-Board-Meeting-June-18-2025

Will County Board Halts Transportation Plan After Contentious 143rd Street Debate

The Will County Board voted Wednesday to send its five-year, multi-million dollar transportation improvement plan back to committee, effectively pausing all projects after a lengthy and heated debate over the...
Will-County-Board-Meeting-June-18-2025

Will County Board Upholds Zoning Denials, Rejecting Developer Appeals

The Will County Board on Wednesday backed its Planning and Zoning Commission (PZC), denying two separate appeals from property owners who sought to overturn the commission’s recommendations against their projects....
Will-County-Board-Meeting-June-18-2025

Split Vote Halts Monee Truck Terminal Project

A proposed truck terminal on vacant land at West Monee-Manhattan Road in Monee Township was stopped in its tracks Wednesday after the Will County Board delivered a split decision on...
Will-County-Board-Meeting-June-18-2025

Future Quarry Fight Looms as Board Approves ‘Tequila Barrel’ Retreat

While the Will County Board greenlit a unique tourist destination featuring overnight stays in repurposed tequila barrels, it also received formal notice of a coming fight to shut down a...