frankfort-village-hall-graphic-logo.7

Frankfort Advances Plans for New Multi-Use Paths to Boost Pedestrian Safety

Spread the love

Article Summary
The Frankfort Village Board has approved a $77,500 agreement with Robinson Engineering, Ltd. to design two new multi-use paths aimed at improving safety and connectivity in Main Park and along Pfeiffer Road. The project addresses resident concerns about pedestrian safety during sporting events and will connect southeastern neighborhoods to the village’s broader trail system.

Multi-Use Path Agreement Key Points:

  • The board approved a $77,500 professional services agreement with Robinson Engineering, Ltd. for the design phase.

  • One path will be built on the west side of Locust Street in Main Park, connecting the north and south parking lots.

  • A second path will run along the east side of Pfeiffer Road, from Laraway Road south to an existing path in the Stone Creek subdivision.

  • The fee covers design, topographic and property surveying, engineering plans, and bidding services.

FRANKFORT – Plans to enhance pedestrian safety and trail connectivity in Frankfort are moving forward after the Village Board on Monday approved a $77,500 contract to design two new multi-use paths.

The board authorized an agreement with Robinson Engineering, Ltd. for the design of a path within Main Park and another along a stretch of Pfeiffer Road. The projects are intended to address safety concerns and expand the village’s trail network.

Trustee Adam Borrelli, who presented the resolution, called the project “a pleasure to present.” He detailed the two locations, noting the first path will run along the west side of Locust Street in Main Park, from the north parking lot to the south parking lot. The second will be constructed on the east side of Pfeiffer Road, extending south from Laraway Road to connect with an existing path in the Stone Creek Phase I subdivision.

During board comments, Borrelli emphasized the project’s importance, calling it a “huge win.” He said the Main Park path directly responds to safety concerns raised by residents.

“Specifically during sporting events, specifically Falcons, and in the fall when it gets real busy over there… the board worked with the park district to come up with a plan to put a walking path along Locust there so that people aren’t walking in the street when they walk over to the ball fields,” Borrelli said. “I think that’s going to improve safety tremendously.”

The Pfeiffer Road path will provide a critical link for residents in the southeastern part of the village. “This is a little south extension that will then connect the neighborhood that starts at Stone Creek, but then also Lake View Estates and so forth,” Borrelli explained. “That’s going to be a huge improvement for our residents.”

The $77,500 fee to Robinson Engineering covers the initial design phase, which includes topographic surveying, property surveying, creating engineering plans and specifications, and handling bidding services. Construction costs are separate; preliminary estimates included in the agenda packet project the Main Park path could cost $180,000 and the Pfeiffer Road path could cost $375,000.

Trustee Maura Rigoni, who is employed part-time by Robinson Engineering, abstained from the vote on this item to avoid a conflict of interest. “For the record, I am not an owner, officer, or registered agent, and I do not have any financial interest in Robinson Engineering beyond my part-time employment,” Rigoni stated before abstaining.

Leave a Comment





Latest News Stories

diamond shaped orange red reflector street sign that reads road

Laraway Road Widening Project in New Lenox and Frankfort Gets Additional $468,000 for Redesign

Article Summary: The Will County Board approved a supplemental agreement worth $468,374 for additional design and engineering work on the major Laraway Road expansion project. The funds are needed for...
solar panels photovoltaics in solar farm

“Federal Policy Uncertainty” Blamed for Delay of Peotone Solar Farm; County Grants Second Extension

Article Summary: The Will County Board has granted a second permit extension for a solar farm in Peotone Township after the developer, Trajectory Energy Partners, cited "ongoing uncertainty regarding federal...
solar panels photovoltaics in solar farm

Will County Grants Extensions to Five Solar Projects Sold to New Developers

Article Summary: The Will County Board approved first-time permit extensions for five commercial solar projects across Monee, Crete, and Joliet townships, all of which were recently sold to larger energy...
WCO 2025-09-27 at 9.04.10 AM

Will County Board Approves Controversial Drug Recovery Retreat in Crete Township

Article Summary: The Will County Board has approved a special use permit for The Second Story Foundation to operate a long-term residential recovery program for men on a 68-acre horse...
District 114 Bus

Parents Voice Alarms Over Bus Safety, Lateness in Manhattan School District

Article Summary: Parents raised serious transportation safety and reliability concerns at the Manhattan School District 114 board meeting, including a harrowing account of a kindergartener being dropped off at the...
Meeting Briefs

Meeting Summary and Briefs: Village of Manhattan Board of Trustees for September 16, 2025

The Manhattan Village Board took steps to prepare for future growth at its Tuesday meeting, awarding a contract of over half a million dollars to extend water and sewer infrastructure...
Joliet-Junior-college.-Graphic-Logo.4

Joliet Junior College Honors Seven Long-Serving Employees Upon Retirement

Joliet Junior College Board of Trustees Meeting | September 2025 Article SummaryThe Joliet Junior College Board of Trustees formally recognized seven long-serving employees who are retiring, including Dr. Robert "Bob"...
Screenshot 2025-09-27 at 8.39.48 AM

Manhattan Police Department Promotes Garrison to Commander, Diaz to Sergeant

Article Summary: The Manhattan Police Department solidified its command structure with the promotions of William Garrison to the rank of Commander and Bryan Diaz to Sergeant, who were both officially...
Meeting Briefs

Meeting Summary and Briefs: Manhattan Fire Protection District for August 18, 2025

Manhattan Fire Protection District | August 18, 2025 Meeting The Manhattan Fire Protection District Board of Trustees focused on the future of its facilities and public safety at its meeting...
Screenshot 2025-09-27 at 8.36.16 AM

Village of Manhattan Honors St. Joseph’s Catholic School on its 100th Anniversary

Article Summary: The Village of Manhattan celebrated a major community milestone at its Tuesday board meeting, officially honoring St. Joseph's Catholic School for its 100th anniversary with a formal proclamation...
Joliet-Junior-college.-Graphic-Logo.4

JJC Board Approves Contract with Adjunct Faculty Union

Joliet Junior College Board of Trustees Meeting | September 2025 Article SummaryThe Joliet Junior College (JJC) Board of Trustees approved a new collective bargaining agreement with the Joliet United Adjuncts...
Screenshot 2025-09-27 at 8.36.16 AM

Manhattan Awards $547K Contract for US 52 Infrastructure Extension to Spur Growth

Article Summary: The Village of Manhattan has awarded a $547,449 contract to Speece Construction for a significant sewer and water main extension project along the US 52, Smith Road, and...
manhattan fire district graphic logo.3

Fire District to Address Safety at High-Accident Intersections with County DOT

Manhattan Fire Protection District | August 18, 2025 Meeting Article Summary: The Manhattan Fire Protection District will meet with the Will County Department of Transportation to provide data and seek...
Meeting Briefs

Meeting Summary and Briefs: Manhattan Township for August 2025

Manhattan Township Meeting | August 2025 The Manhattan Township Board took steps to address the growing interest in renewable energy at its meeting on Tuesday, August 12, 2025, by scheduling...
Screenshot 2025-09-27 at 8.16.09 AM

Manhattan Eyes Major Water and Sewer Rate Hikes to Fund Over $50 Million in Infrastructure Projects

Article Summary: To address aging infrastructure and prepare for significant future growth, Manhattan officials are planning more than $50 million in crucial water and sewer system upgrades, which will necessitate...