Screenshot 2025-10-25 at 10.22.19 AM

Manhattan Approves Annexation for 41-Home Butternut Ridge South Subdivision

Spread the love

Manhattan Village Board Meeting | October 21, 2025

Article Summary: The Manhattan Village Board has approved the annexation, rezoning, and preliminary plat for a 41-home subdivision on a 20-acre parcel south of the existing Butternut Ridge development. The project by Skyline Real Estate Development, LLC will feature lots with an average size of over 12,800 square feet.

Butternut Ridge South Development Key Points:

  • The Village Board approved the annexation of a 20-acre parcel into Manhattan.

  • The project, named Butternut Ridge South, will create 41 single-family residential lots.

  • The property was rezoned from ER Estate Residential to R-1 Single Family Residential.

  • The developer is Skyline Real Estate Development, LLC.

The Manhattan Village Board on Tuesday, October 21, 2025, gave its final approval for a new 41-home subdivision, annexing and rezoning a 20-acre parcel of unincorporated land just south of the existing Butternut Ridge neighborhood.

The board unanimously passed a series of ordinances that authorized an annexation agreement with developer Skyline Real Estate Development, LLC, officially brought the territory into the village, rezoned the property from ER Estate Residential to R-1 Single Family Residential, and approved the preliminary plat of subdivision.

The development, called Butternut Ridge South, will consist of 41 single-family lots. According to a village memo, the average lot size will be 12,832 square feet, with all lots exceeding the 10,000-square-foot minimum required by village code.

Nathaniel Washburn, an attorney representing the developer, addressed the board during a public hearing held at the start of the meeting. “This is a residential subdivision immediately south of the existing Butternut subdivision,” he said. “These lots by agreement are slightly larger than the current zoning standard require.”

Washburn noted there were negotiations over the specifics of the development, resulting in “concessions back and forth.” He characterized the final plan as featuring “larger lots, larger homes, and more substantial improvements than would have been typically required.”

The project will have a right-in/right-out access point onto Cedar Road, with additional access provided through the existing Butternut Ridge Subdivision to the north. A detention pond is planned for the southwest corner of the site.

The village’s Planning and Zoning Commission was unable to make a formal recommendation on the project at its August meeting due to a lack of a quorum. As a result, the public hearing was continued and held by the full Village Board before the votes. No members of the public spoke during the hearing.

Leave a Comment





Latest News Stories

jackson township graphic.2

Jackson Township Refers Manure-to-Gas Plant Proposal to Planning Commission

Article Summary: Representatives for a company named Elwood81, LLC, presented a proposal for an anaerobic digestion facility to the Jackson Township Board. Following the presentation, the board directed the company...
WCO 2025-09-27 at 9.05.04 AM

County Board Abates Over $25 Million in Property Taxes for Bond Payments

Article Summary: Will County property taxpayers will be spared over $25 million in taxes for the 2026 payment year after the County Board voted to abate taxes for six separate...
Manhattan School District 114 Logo Graphic

School Board Approves ‘Board Book Premier’ for Paperless Meetings

Article Summary: The Manhattan School District 114 will transition to a digital platform for its board meetings, selecting Board Book Premier to improve public access to documents and create a...
Screenshot

Lincoln-Way 210 Prepares for “Retirement Wave” with Focus on Recruitment

Article Summary: Lincoln-Way High School District 210 is bracing for a significant number of retirements, with 47 teachers expected to leave over the next four years, representing nearly a quarter of...
Press Plus

District 114 to Overhaul Policy Updates with New ‘Press Plus’ Service

Article Summary: Manhattan School District 114 is moving forward with Press Plus, a service from the Illinois Association of School Boards designed to streamline and modernize the updating of its...
lincoln way school district 210 logo.2

Lincoln-Way Board Weighs Community Solar Program Promising $155,000 in Annual Savings

Article Summary: The Lincoln-Way District 210 board is considering a 20-year agreement to participate in a state-sponsored community solar program that could save the district an estimated $155,000 annually on electricity...
WCO 2025-09-27 at 9.04.56 AM

Will County Reverses Zoning on Peotone Farmland to Facilitate 10-Acre Sale

Article Summary: The Will County Board unanimously approved a request to rezone a 10.08-acre portion of a property in Will Township back to agricultural use, reversing a 2023 zoning change....
Meeting Briefs

Meeting Summary and Briefs: Joliet Junior College Board of Trustees for September 10, 2025

Joliet Junior College Board of Trustees Meeting | September 2025 The Joliet Junior College (JJC) Board of Trustees approved a landmark agreement with the City of Joliet to explore a...
manhattan park district graphic.2

Manhattan Park Board Hires New Architect for Round Barn Buildout, Secures Annexation for Future Banquet Hall

Article Summary: The Manhattan Park Board advanced its plans for the historic Round Barn Farm on Thursday, August 14, 2025, by hiring a new design firm for a partial interior...
Screenshot

Lincoln-Way 210 Board Approves $172.7 Million Budget with Planned Deficit for Bus Purchases

Article Summary: The Lincoln-Way Community High School District 210 Board of Education approved the Fiscal Year 2026 budget, which includes a planned operating deficit of $814,000 to accommodate the purchase of...
District 114 Graphic

Manhattan School District 114 Approves $41.5 Million Budget for FY26

Article Summary: The Manhattan School District 114 Board of Education unanimously approved a fiscal year 2026 budget with $41.5 million in expenditures, a figure significantly influenced by the final costs...
Peotone fire district graphic logo.1

Manhattan Fire District Advances New Station with $8.75M Bond Hearing, Approves Contracts with $194,000 Savings

Article Summary: The Manhattan Fire Protection District is moving forward with plans for a new Station 81 after holding a public hearing for an $8.75 million bond sale and approving...
Enbridge Energy

Will County to Pay Enbridge $82,000 to Relocate Pipeline Equipment for Exchange Street Improvements

Article Summary: Will County will reimburse Enbridge Energy for costs associated with relocating its pipeline facilities to make way for roadway improvements on Exchange Street in the Monee and Crete...
diamond shaped orange red reflector street sign that reads road

Laraway Road Widening Project in New Lenox and Frankfort Gets Additional $468,000 for Redesign

Article Summary: The Will County Board approved a supplemental agreement worth $468,374 for additional design and engineering work on the major Laraway Road expansion project. The funds are needed for...
solar panels photovoltaics in solar farm

“Federal Policy Uncertainty” Blamed for Delay of Peotone Solar Farm; County Grants Second Extension

Article Summary: The Will County Board has granted a second permit extension for a solar farm in Peotone Township after the developer, Trajectory Energy Partners, cited "ongoing uncertainty regarding federal...