Screenshot 2025-11-05 at 3.23.31 PM

Manhattan Grapples with Route 52 Safety After Tragedy, Demands Action from IDOT

Spread the love

Manhattan Village Board Meeting | November 4, 2025

Article Summary: Following a recent tragedy, the Manhattan Village Board on Tuesday, November 4, 2025, held an extensive public discussion on the urgent need for safety improvements along U.S. Route 52, outlining past requests to the Illinois Department of Transportation (IDOT) and committing to new engineering studies for downtown crosswalks.

Route 52 Safety Key Points:

  • The Village Board reviewed a long history of requests to IDOT for safety measures, including speed reductions, truck restrictions, and intersection improvements.

  • Following a recent fatal accident, the village is commissioning a new $16,000 engineering study for pedestrian safety improvements at Route 52 and North Street.

  • Residents and board members expressed frustration with IDOT’s slow response times, with some citizens launching their own action groups to pressure state officials.

  • The board heard a presentation on advanced crosswalk lighting technology designed to increase pedestrian visibility and prevent accidents.

MANHATTAN, IL – An emotional discussion about traffic safety dominated the Manhattan Village Board meeting on Tuesday, November 4, 2025, as trustees, staff, and residents grappled with solutions for the notoriously dangerous U.S. Route 52 following a recent community tragedy.

Mayor Mike Adrieansen began the discussion by acknowledging the community’s pain and outlining the village’s persistent, multi-year efforts to get the Illinois Department of Transportation (IDOT) to implement safety measures. “Motorist and pedestrian safety on Route 52 has obviously been a concern for myself and the board for many years,” Adrieansen said. “Now we have had a tragedy and I just want our community to do everything possible to avoid having another family go through loss and pain.”

Adrieansen detailed a timeline of requests to IDOT dating back to July 2020, which included submitting a traffic study with bypass options, requesting truck size-limit signs, updating truck maps to show Route 52 as restricted, and requesting speed reductions. He noted that IDOT has begun a phase-one engineering study for the area near Baker Road, but a proposal is likely a year away.

In response to the recent events, the village is taking immediate action on its own. Adrieansen announced plans to commission a new engineering study, at a cost of approximately $16,000, to prepare shovel-ready plans for safety improvements at the downtown intersection of Route 52 and North Street. Proposed improvements include a potential traffic signal or three-way stop, moving the stop sign closer to the intersection, adding flashing lights, and installing pavement markings to slow traffic.

“We can get this all prepared, engineered, and then go to IDOT and say this is what we need and this is what we want you to implement,” Adrieansen stated, adding that the village may fund the project itself if IDOT allows it.

The board also heard a presentation from a lighting specialist on advanced crosswalk lighting systems designed to dramatically increase pedestrian visibility. The technology uses offset, tightly focused beams to create a “positive contrast,” making individuals in the crosswalk four times brighter than the surrounding roadway, even if they are wearing dark clothing.

During public comment, resident Andrea Baumhardt highlighted the dangers at the intersection of Baker Road and Route 52. “It’s hard to see the traffic beyond those cars,” she said, advocating for a stop light and turn lanes. “It’s getting more and more dangerous to pull into our neighborhood.”

Adam Allers announced the formation of a new citizen action group, the Bike Walk Alliance of Manhattan, to organize public testimony and present a unified community voice to state and county officials.

Board members and staff expressed deep frustration with IDOT’s responsiveness. Police Chief Ryan Gulli said that while resident surveys are useful, immediate action is needed. “I think we need to get to work,” Gulli said. “We’ve already determined it’s dangerous. We don’t have much time to wait. I’m not happy right now with the lack of urgency behind IDOT.”

Trustee Bob Dilling, who worked for IDOT for 33 years, sympathized with the delays. “Working with IDOT is like dealing with cold molasses. It just doesn’t move quick,” Dilling said. “Everybody on this board and I think everybody in town wants to get things done and trying to get through IDOT… it’s a challenge.”

Leave a Comment





Latest News Stories

Will County Land Use Meeting Briefs

LAND USE ACTIONS Accessory Dwelling Unit Rules Modified: The committee recommended approval of text amendments allowing accessory dwelling units to exceed current building area limitations in certain circumstances. The changes...
will-county-board.2

Public Health and Safety Committee Meeting Briefs

Sunny Hill Nursing Home Tour Praised: Committee members who attended the May 9 tour of Sunny Hill Nursing Home praised the facility's condition and operations. Member Raquel Mitchell called it...
Medicaid-logo

Federal Reconciliation Bill Targets Medicaid, SNAP Programs

Will County Legislators Briefed on Potential Local Impacts Federal legislation making sweeping cuts to Medicaid and food assistance programs could significantly impact Will County residents and services, county legislators learned...
MH VB 6-3

Manhattan Celebrates 100-Year Resident Ruth Munt at Village Board Meeting

Manhattan resident Ruth Munt received a special 100th birthday celebration at Tuesday's Village Board meeting, sharing her remarkable perspective on seven decades of community growth. Munt, who moved to Manhattan...
will-county-board.2

Will County Approves Modified $756 Million Transportation Plan Despite Terminology Debate

Will County's Public Works and Transportation Committee approved a five-year, $756 million transportation improvement plan on June 3, but not before a heated debate over whether to call it a...
will-county-board.3

Will County completes major projects while others move forward

Will County's facilities team has completed several major projects while advancing others throughout the county, officials reported during a Capital Improvements & IT Committee meeting Monday. The Old Courthouse Plaza...
MH VB 6-3

Eastern Avenue Road Project Moves Forward with Binder Installation, Final Phase Bidding Set

Manhattan's Eastern Avenue reconstruction project will take another step forward this month as contractors prepare to install temporary road binder, while the village prepares to accept bids for the final...
will-county-board.3

Will County Accepts $140,000 Developer Donation for Road Improvements

Will County's Public Works and Transportation Committee accepted a $140,143.90 donation from a developer in lieu of constructing traffic improvements along Laraway Road. The donation comes from the Lakes Park...
will-county-board.2

State Legislative Session Wrap-Up Shows Mixed Results

Will County's state legislative priorities saw mixed results as the Illinois General Assembly concluded its spring session on May 31, with several key bills advancing while others stalled. The Legislative...
will-county-board.2

Will County expands safety initiatives across facilities

Will County has implemented new safety protocols and training programs across its facilities, including the selection of department safety monitors and participation in community health education events. Each county department...
will-county-board.3

Leglislative Committee Meeting Briefs

Federal Grant Deadline Extended: The Surface Transportation Reauthorization deadline has been extended to May 30 for policy submissions, with both House and Senate committees actively seeking stakeholder input ahead of...
MH VB 6-3

Village Releases $2.8 Million Letter of Credit for Completed Stonegate Subdivision

The Manhattan Village Board approved the release of a nearly $2.9 million letter of credit for the Stonegate subdivision after village engineers confirmed all required public improvements have been completed....
will-county-board.3

Speed Limits Reduced on Two Township Roads

The committee approved new speed zones for two township roads based on engineering studies showing current limits exceed safe driving speeds. Offner Road in Green Garden Township will have a...
will-county-board.2

Will County Finance Committee Approves Juvenile Detention Center Upgrades

Committee votes to keep facility operational, moves forward with compliance modifications Will County Finance Committee members voted unanimously Monday to recommend keeping the River Valley Detention Center operational and making...
will-county-board.2

Major Grade Separation Projects Advance with Engineering Contracts

The committee approved two significant engineering agreements for major railroad overpass projects totaling over $4 million. TranSystems Corporation received a $4,003,256 contract for construction engineering services on the Lorenzo Road...