New Lenox D122 Board Approves Nearly $300,000 for Summer Maintenance Projects
The New Lenox School District 122 Board of Education has approved a comprehensive list of 56 maintenance and capital improvement projects to be completed over the summer, allocating a total of $299,024 for the work.
The projects, which range from district-wide carpet cleaning and fire system inspections to refinishing bathroom floors and replacing equipment, were approved as part of the consent agenda at the board’s May 20 meeting. The work will be managed internally by the district’s maintenance department and is budgeted as part of the 2025-2026 fiscal year.
According to a memo from Business Manager Robert Groos, the district’s Director of Facilities collaborates with building principals each spring to identify and prioritize projects for the board’s approval. This annual process aims to address necessary upkeep, repairs, and upgrades across all school buildings while students are on summer break.
The approved list includes several significant district-wide expenditures. The largest single item is $31,402 for carpet cleaning in all buildings, awarded to Cornelia Carpet. Other major service contracts include $20,000 for power strips, $15,000 for mulch from Dutch Barn, and a $10,264 contract with Shorewood Home & Auto for a new tractor with a plow and salt spreader.
Several schools will see targeted improvements. A major project at Bentley School involves refinishing bathroom floors and updating sinks and partitions, with an estimated cost of $35,000. Pointe/Crossing School is slated for a $6,900 VFD replacement for its HVAC system.
The district also budgeted for essential safety and maintenance inspections, including $9,500 for fire suppression and alarm systems, $4,158 for backflow certifications, and $10,574 for basketball backstop inspections.
The board approved the project list in a unanimous vote. The motion was made by Vice President David Rush and seconded by board member Bill Pender. All board members, including President Stephanie Peltzer, Nicole DeGrave, Al Haring, Fay Bowie, and Megan Wendtland, voted in favor.
The full list of projects includes numerous smaller but essential tasks, such as painting, landscaping, concrete repairs, and equipment service at various schools, ensuring facilities are prepared for the start of the 2025-2026 school year.
Latest News Stories
Trump signs executive order to improve foster care
Hegseth announces Operation Southern Spear, targeting narco-terrorists
Justice Department accuses California of racial gerrymandering in redistricting plan
Illinois quick hits: WARN Act reporting shows 1,600 job losses in October
Pritzker, alders oppose Chicago tax plans, property tax hike could be next
State Department designates European Antifa groups foreign terror organizations
NetChoice scores legal win in social media warning lawsuit
Union Pacific–Norfolk Southern merger draws more support as critics push back
TSA agents who worked throughout shutdown to receive $10,000 bonus
Boeing to pay $36M to family of Indian woman killed in Ethiopia Air crash
Pro-life org invests $80M into 2026 midterms, will reach 10.5M voters
Refilling Strategic Petroleum Reserve begins