Screenshot 2025-10-25 at 10.48.48 AM

New Lenox Solar Farm Proposal Advances with Conditions, Following Village and Forest Preserve Input

Spread the love

Will County Planning and Zoning Commission Meeting | October 21, 2025

Article Summary: The Will County Planning and Zoning Commission recommended approval for a 62.7-acre commercial solar energy facility in New Lenox Township, contingent on several conditions, including the development of an emergency response plan and adherence to landscaping requests from the Village of New Lenox. The project, proposed by Nexamp Solar LLC, aims to contribute to Illinois’ renewable energy goals under the Climate and Equitable Jobs Act (CEJA).

Spencer Road Solar Farm Key Points:

  • Project Scope: A special use permit was sought for a commercial solar energy facility on a 110-acre property on South Spencer Road, utilizing approximately 62.7 acres for two projects totaling 5.25 MW (AC).

  • Variances Approved: The commission also recommended variances to allow pollinator-friendly ground cover to grow up to 36 inches (from 13 inches) and to reduce the required number of mowings from five to one annually.

  • Local Input: The Village of New Lenox did not object but recommended conditions concerning setbacks, access drive surfacing, fencing, and landscape screening. The Forest Preserve District of Will County also provided recommendations to protect local wildlife.

  • State Law Compliance: The project falls under Illinois Public Law 102-1123, which sets specific parameters and timelines for counties to review commercial solar energy proposals.

JOLIET, IL – The Will County Planning and Zoning Commission on Tuesday, October 21, 2025, recommended approval for a large-scale commercial solar energy facility on approximately 62.7 acres of agricultural land in New Lenox Township. The recommendation, which now goes to the full Will County Board for a final decision, includes a special use permit and two variances aimed at promoting pollinator-friendly habitats on the site.

The project, proposed by developer Nexamp Solar LLC under the names Spencer Road Solar East LLC and Spencer Road Solar West LLC, involves constructing two adjacent solar facilities on a 110-acre property located on South Spencer Road, south of the Village of New Lenox. The combined facilities will feature approximately 12,029 solar panels on single-axis tracker systems, generating a total of 5.25 megawatts (AC).

The proposal is part of the state’s Adjustable Block program under the Climate and Equitable Jobs Act (CEJA), which incentivizes renewable energy projects. According to Illinois law, county review of such projects is subject to a strict timeline, requiring a public hearing within 60 days of a complete application.

In addition to the special use permit, the commission recommended two variances from county code. The first increases the maximum allowed height for ground cover plants from 13 inches to 36 inches. The second reduces the required number of mowings from five times per year to just once. Staff reports indicated these variances are crucial for establishing a “pollinator-friendly solar site” under the Illinois Pollinator-Friendly Solar Site Act. The taller native vegetation and reduced mowing allow deep-rooted pollinator species to propagate, which helps recharge agricultural soils, improve water infiltration, and provide habitat for birds and insects.

The Village of New Lenox, whose corporate boundary is within 400 to 1,300 feet of the property, reviewed the project and did not object. However, the village board recommended five conditions for approval. These include meeting all county setback requirements, installing a concrete or asphalt surface for the access drive within the Spencer Road right-of-way, installing an eight-foot-tall Fixed Knot Farm fence, placing landscape screening along the western fence line, and abiding by all New Lenox Fire Protection District requirements.

The Forest Preserve District of Will County also submitted a letter with recommendations to mitigate environmental impacts. The district suggested installing wildlife-friendly fencing with a six-inch gap at the bottom to allow for animal movement, clearing trees only between November 1st and March 31st to protect wildlife, and using native quality plant species for landscaping.

According to the developer, the site will be remotely monitored 24/7, with employees only visiting occasionally for maintenance. The project is expected to create 20 to 25 local jobs during its estimated six-month construction phase, anticipated to begin in the fall of 2026. The developer has also entered into an Agricultural Impact Mitigation Agreement (AIMA) with the Illinois Department of Agriculture to ensure the preservation of the agricultural land and provide financial assurance for the eventual decommissioning of the facility.

Leave a Comment





Latest News Stories

Black and white speed limit 25 sign

Will County Board Advances New Speed Limits in Green Garden and Frankfort Townships

Will County Public Works & Transportation Committee Meeting | November 2025 Article Summary: The Will County Board approved new speed limits for a section of Stuenkel Road in Green Garden...
Will County Logo Graphic

New Lenox Garage Variance Denied After Neighbor Cites ‘Massive’ Scale and Neighborhood Impact

Will County Planning and Zoning Commission Meeting | November 4, 2025 Article Summary: The Will County Planning and Zoning Commission unanimously denied a New Lenox Township homeowner's request for a variance...
manhattan elwood library graphic.2

Library Board Adopts New Cell Phone Stipend Policy for Employees

Manhattan-Elwood Public Library District Board Meeting | September 2025 Article SummaryThe Manhattan-Elwood Public Library District Board of Trustees has approved a new policy to provide a cell phone stipend for...
Screenshot 2025-11-05 at 3.24.09 PM

Manhattan Announces Proposed 6% Property Tax Levy Increase

Manhattan Village Board Meeting | November 4, 2025 Article Summary: The Manhattan Village Board has announced a proposed 2025 property tax levy of $3,828,252, which represents an approximate 6.09% increase...
Joliet-Junior-college.-Graphic-Logo.5

JJC Celebrates “Future Wolves” Partnerships with Joliet and Troy School Districts

Joliet Junior College Board of Trustees Meeting | October 15, 2025 Article SummaryJoliet Junior College celebrated its "Future Wolves" initiative by issuing proclamations honoring its inaugural partnerships with Joliet Public...
Screenshot 2025-11-06 at 4.17.20 PM

State Veto Session Passes Energy Bill Limiting County Zoning, Approves Toll Hike for Mass Transit

Meeting Summary and Briefs: Will County Legislative Committee for November 4, 2025 Article Summary: A state lobbyist reported to Will County that the Illinois General Assembly passed a major energy bill...
will county board graphic

Commission Approves Peotone-Area Farmhouse Split, Overruling Staff’s “Spot Zoning” Concerns

Will County Planning and Zoning Commission Meeting | November 4, 2025 Article Summary: The Will County Planning and Zoning Commission approved a request to rezone a 1.75-acre portion of a larger...
Screenshot 2025-11-05 at 4.18.19 PM

Will County Finance Committee Hits Impasse on 2025 Tax Levy, Postpones Budget Votes

Will County Finance Committee Meeting | November 2025 Article Summary: The Will County Finance Committee postponed votes on the 2025 tax levy and the 2026 budget after a contentious debate...
manhattan park district graphic.1

Manhattan Park Board Tables Decision on Site Plan for Potential Development

Manhattan Park Board Meeting | September 2025 Article Summary: The Manhattan Park Board postponed a decision on a proposal from Arete Design Studio to create a concept site plan, citing concerns...
Screenshot 2025-11-06 at 4.17.15 PM

Federal Lobbyists Brief Will County on Government Shutdown, Warn of SNAP and TSA Disruptions

Meeting Summary and Briefs: Will County Legislative Committee for November 4, 2025 Article Summary: Will County’s federal lobbyists reported that the ongoing government shutdown, now the longest in U.S. history, is...
Will County Logo Graphic

Commission Approves Mokena-Area Garage Variance Over Village’s Objection

Will County Planning and Zoning Commission Meeting | November 4, 2025 Article Summary: The Will County Planning and Zoning Commission approved a variance for a new garage in unincorporated Frankfort Township...
Screenshot 2025-11-05 at 4.02.49 PM

Will County Committee Advances Gougar Road Bridge Project with Over $540,000 in Agreements

Will County Public Works & Transportation Committee Meeting | November 2025 Article Summary: The Will County Board approved two key agreements for the Gougar Road bridge project in New Lenox,...
Screenshot 2025-11-05 at 3.23.49 PM

Village Administrator Jeff Wold Resigns; Marc Nelson Appointed Interim

Manhattan Village Board Meeting | November 4, 2025 Article Summary: Manhattan Village Administrator Jeff Wold announced his resignation on Tuesday, November 4, 2025, to return to a career in law...
manhattan elwood library graphic.4

Manhattan-Elwood Library Board Reviews 2024-2025 Financial Audit

Manhattan-Elwood Public Library District Board Meeting | September 2025 Article SummaryThe Manhattan-Elwood Public Library District Board of Trustees received the results of its annual financial audit for the 2024-2025 fiscal...
Joliet-Junior-college.-Graphic-Logo.4

JJC Receives Surprise $1.9 Million from IRS Employee Retention Credit

Joliet Junior College Board of Trustees Meeting | October 15, 2025 Article SummaryJoliet Junior College has received an unexpected $1.9 million windfall from the federal Employee Retention Credit (ERC), a...