WCO-Landfill-8.5.25.1

Will County Receives Detailed Update on Landfill Expansion Investigation

Spread the love

Article Summary:

The Will County Landfill Committee received a comprehensive technical update on the site investigation for the planned horizontal expansion of the county landfill, confirming the project remains on schedule. Consultants presented detailed findings from the completed geological and hydrogeological fieldwork, which will inform the final engineering and design of the new landfill area to ensure public and environmental safety.

Landfill Expansion Key Points:

  • Drilling of nine new borings and continuous soil and bedrock sampling for the expansion area is complete, with samples being sent for extensive laboratory analysis.

  • Fourteen new piezometers, or monitoring wells, have been installed to characterize groundwater conditions and will be used for an impact evaluation model.

  • Engineers are refining the expansion’s design, including adjusting the northern boundary to maximize airspace and designing a V-notched base for efficient leachate collection.

  • Despite the fieldwork phase taking slightly longer than anticipated, project consultants confirmed the overall expansion timeline has not been delayed.

The Will County Landfill Committee on Thursday received a detailed update on the extensive site investigation for the planned expansion of the county landfill, learning that the project remains on schedule as engineers begin analyzing a trove of geological data.

A consultant for the project, Mr. Fallon, walked committee members through the now-completed fieldwork phase, which involved drilling nine borings as deep as 140 feet to characterize the soil, clay, and bedrock at the proposed expansion site. He explained that the purpose of the in-depth investigation is to provide engineers with the necessary data to design a site that protects public health, safety, and welfare.

“We have logged and continuously sampled nine additional borings to supplement that information at the existing facility,” Fallon stated. “Those samples have all been delivered to the lab. And actually… we have already received back I would say about 75% of those analytical results.”

The investigation included collecting undisturbed soil samples using Shelby tubes and rock cores to conduct a battery of laboratory tests. These tests, Fallon explained, measure properties like soil density, moisture content, permeability, and shear strength. The results are critical for engineering calculations that ensure the stability of the landfill’s slopes and foundation.

In addition to soil stability, the investigation is focused on groundwater. Fourteen new piezometers—small-diameter wells—have been installed at various depths to monitor different water-bearing zones. This data will be used to create a groundwater impact evaluation model.

“We’ll take the landfill design once it’s once our engineers have developed that and then we’ll… place it into the into the geologic system,” Fallon said in response to a question from member Dawn Bullock. “And then we’ll assume that it’s leaking and we’ll evaluate… after 100 years after closure what are the what are the concentrations of this hypothetical plume at the zone of attenuation.”

Fallon noted that this modeling is a state requirement for the sighting application.

The data is already informing design tweaks. Stormwater modeling has shown that the planned retention ponds are larger than necessary, allowing engineers to push the landfill’s northern boundary slightly to “eek out a little more airspace.” They are also designing the base grades with a “V-notch design” to better channel leachate to a sump location for extraction.

County Board Speaker Joe VanDuyne asked if the water from the underlying aquifer could be utilized by the county. Fallon explained that this would be out of the question, citing both the unsuitability of the small monitoring wells for water supply and a deed restriction on the property. “We have a deed restriction we’re not allowed to use any of the water for drinking purposes,” he said.

Vice-Chair Kelly Hickey, who chaired the meeting, asked if there were any changes to the project’s timeline.

“We haven’t had a delay in the project yet,” Fallon responded. “The field investigation did take a little longer than we than we had thought it would… but within the larger framework of the project, I feel like we’re still on schedule.”

Leave a Comment





Latest News Stories

Will County Board Graphic.04

Behavioral Health Division Drops Wait Times, Reports Zero Opioid Deaths in February

Public Health & Safety Committee Meeting | March 5, 2026 Article Summary: Will County’s Behavioral Health Division reported significant operational improvements, including a near-elimination of wait times for therapy and...

Meeting Summary and Briefs: Village of Manhattan for March 3, 2026

Village of Manhattan Meeting | March 3, 2026 The Manhattan Village Board met on Tuesday, March 3, 2026, to address village operations and listen to community concerns. The board heard...
Will County Board Graphic.03

Harris Drive Residents Plead for County Intervention Amid Failing Septic Systems and Flooding

Public Health & Safety Committee Meeting | March 5, 2026 Article Summary: Residents of Harris Drive appealed to the Public Health and Safety Committee for help with severe seasonal flooding...
Screenshot 2026-03-29 at 4.35.20 PM

Manhattan Village Board Approves Public Works Hires and Wastewater Equipment Purchase

Village of Manhattan Meeting | March 3, 2026 Article Summary: The Manhattan Village Board finalized the hiring of two full-time Public Works maintenance laborers and authorized the purchase of a new...
Police Crime

Will County Sheriff’s Office Investigates Fatal Hit-and-Run in Homer Glen

Article Summary: The Will County Sheriff’s Office is seeking the public's assistance in identifying a driver involved in a fatal hit-and-run crash in Homer Glen that left a pedestrian dead....
will county Committee-Public Health & Safety.Graphic

Federal Funding Freezes Threaten Will County Public Health Programs Amid Ongoing Lawsuits

Public Health & Safety Committee Meeting | March 5, 2026 Article Summary: Will County health officials are bracing for potential service disruptions as they monitor multiple federal lawsuits surrounding frozen...
Screenshot 2026-03-29 at 4.35.20 PM

Manhattan Village Board Hears Pushback Against Massive Solar Farm and Industrial Expansion

Village of Manhattan Meeting | March 3, 2026 Article Summary: A grassroots leader warned the Manhattan Village Board about a massive proposed solar facility and looming industrialization, asking for local cooperation...
Will County Board Federal Agenda

Board Splits Along Party Lines to Approve 2026 Federal Legislative Agenda

Will County Board Meeting | February 19, 2026 Article Summary: The Will County Board adopted its 2026 Federal Legislative Agenda in a 10-9 vote, establishing the county's priorities for lobbying efforts...
Will County Board Graphic.01

Meeting Summary and Briefs: Will County Landfill Committee for February 10, 2026

Will County Landfill Committee Meeting | February 10, 2026 The Will County Landfill Committee met on Tuesday to address legal preparations for the upcoming landfill expansion and operational needs at...
Will County Board Graphic.03

Meeting Summary and Briefs: Will County Board for February 19, 2026

Will County Board Meeting | February 19, 2026 Meeting SummaryThe Will County Board meeting on Thursday, February 19, 2026, was marked by significant zoning decisions, including the unanimous rejection of...
Will County Board Graphic.04

Board Approves Joliet Township Clean Fill Facility Despite Environmental Objections

Will County Board Meeting | February 19, 2026 Article Summary: The Will County Board approved a map amendment and special use permit for a Clean Construction and Demolition Debris (CCDD) facility...
solar panels photovoltaics in solar farm

Will County Board Unanimously Rejects Controversial Solar Farm in Troy Township

Will County Board Meeting | February 19, 2026 Article Summary: The Will County Board unanimously rejected a special use permit for a commercial solar energy facility near Shorewood following strong opposition...
Will County Board Graphic.03

Committee Approves $740,000 Compressor to Boost RNG Plant Uptime

Will County Landfill Committee Meeting | February 10, 2026 Article Summary: The Landfill Committee approved the purchase of a fourth feed compressor for the Renewable Natural Gas (RNG) facility to...
Meeting Briefs

Meeting Summary and Briefs: Lincoln-Way District 210 Board of Education for February 19, 2026

Lincoln-Way District 210 Board of Education Meeting | February 19, 2026 NEW LENOX – The Lincoln-Way Community High School District 210 Board of Education met on Thursday, February 19, 2026, to...
Will County Board Graphic.04

County Approves $1.9 Million for Wilmington-Peotone Road Engineering

Will County Board Meeting | February 19, 2026 Article Summary: The Will County Board authorized nearly $2 million in Motor Fuel Tax funds to begin Phase I design engineering for improvements...