Manhattan Approves Estimated $1.1 Million Resurfacing Project for Leighlinbridge Subdivision
Village of Manhattan Meeting | March 16, 2026
Article Summary: The Village of Manhattan approved a state resolution to secure Motor Fuel Tax funding for a major road resurfacing project targeting the Leighlinbridge Subdivision this summer.
Road Resurfacing Key Points:
-
The board unanimously approved an Illinois Department of Transportation (IDOT) resolution for maintenance under the Illinois Highway Code.
-
The 2026 project will focus exclusively on resurfacing streets within the Leighlinbridge Subdivision.
-
The project carries an estimated total cost of $1.1 million, funded through a mix of local and state dollars.
-
Specific streets slated for work include Carlow Circle, Celtic Circle, Leighlin Lane, and Ashford Street.
The Manhattan Village Board on Monday, March 16, 2026, officially greenlit the financing mechanism for its 2026 road resurfacing program, passing a resolution to utilize state Motor Fuel Tax (MFT) funds for extensive roadwork in the Leighlinbridge Subdivision.
The board unanimously approved the mandatory Illinois Department of Transportation (IDOT) “Resolution for Maintenance Under the Illinois Highway Code,” a required administrative step to legally authorize the expenditure of state-distributed MFT funds.
According to the engineering memo provided by Village Engineer Carrie Pintar, the 2026 resurfacing project is projected to cost an estimated $1.1 million. The village plans to utilize a $500,000 budget from its MFT reserves, paired with an estimated $600,000 from local municipal funds. The exact final figures will be determined once competitive construction bids are received and approved.
The comprehensive paving project will entirely focus on the Leighlinbridge Subdivision network. The specific roadways scheduled to be milled and resurfaced include:
-
Carlow Circle West (Celtic Circle to Ashford Street)
-
Carlow Circle East (Ashford Street to Celtic Circle)
-
Celtic Circle (Ashford Street to Ashford Street)
-
Leighlin Lane (Carlow Circle to Gougar Road)
-
Ashford Street (Celtic Circle to Sweedler Road)
Engineering costs for the project will follow standard IDOT rates, with preliminary design engineering accounting for 5% of the construction cost, and construction observation and material testing accounting for 6%.
The resolution passed smoothly via a unanimous roll call vote without debate.
Latest News Stories
No ethics reform in sight as ex-speaker’s scheduled prison term begins
Trump losing ground on economy, poll finds
Major tech company to cut H-1B visas amid Trump pressure, fee
US, India to hold new round of trade talks, with focus on energy
Johnson: Republicans ‘have plans’ to ‘fix’ Obamacare
Illinois House Speaker: ‘Mr. Trump, tear down this fence!’
Energy cost concerns loom as legislators look at policy changes
PJM exit: A price solution or power move?
Broadview, Illinois reduces ICE protest zone after ‘chaos,’ 15 arrests
Illinois’ ‘F’ grade leaves taxpayers on the hook for billions, watchdog says
Illinois quick hits: Chicago Jewish Alliance on peace developments; Blue Ribbon Schools announced
WATCH: Trump’s emergency Guard appeal denied; Fiscal Fallout reviews state salaries
Reforms prompt big money appeals in IL biometrics cases
Meeting Summary and Briefs: Will County Board Executive Committee for October 9, 2025