Manhattan Approves Estimated $1.1 Million Resurfacing Project for Leighlinbridge Subdivision
Village of Manhattan Meeting | March 16, 2026
Article Summary: The Village of Manhattan approved a state resolution to secure Motor Fuel Tax funding for a major road resurfacing project targeting the Leighlinbridge Subdivision this summer.
Road Resurfacing Key Points:
-
The board unanimously approved an Illinois Department of Transportation (IDOT) resolution for maintenance under the Illinois Highway Code.
-
The 2026 project will focus exclusively on resurfacing streets within the Leighlinbridge Subdivision.
-
The project carries an estimated total cost of $1.1 million, funded through a mix of local and state dollars.
-
Specific streets slated for work include Carlow Circle, Celtic Circle, Leighlin Lane, and Ashford Street.
The Manhattan Village Board on Monday, March 16, 2026, officially greenlit the financing mechanism for its 2026 road resurfacing program, passing a resolution to utilize state Motor Fuel Tax (MFT) funds for extensive roadwork in the Leighlinbridge Subdivision.
The board unanimously approved the mandatory Illinois Department of Transportation (IDOT) “Resolution for Maintenance Under the Illinois Highway Code,” a required administrative step to legally authorize the expenditure of state-distributed MFT funds.
According to the engineering memo provided by Village Engineer Carrie Pintar, the 2026 resurfacing project is projected to cost an estimated $1.1 million. The village plans to utilize a $500,000 budget from its MFT reserves, paired with an estimated $600,000 from local municipal funds. The exact final figures will be determined once competitive construction bids are received and approved.
The comprehensive paving project will entirely focus on the Leighlinbridge Subdivision network. The specific roadways scheduled to be milled and resurfaced include:
-
Carlow Circle West (Celtic Circle to Ashford Street)
-
Carlow Circle East (Ashford Street to Celtic Circle)
-
Celtic Circle (Ashford Street to Ashford Street)
-
Leighlin Lane (Carlow Circle to Gougar Road)
-
Ashford Street (Celtic Circle to Sweedler Road)
Engineering costs for the project will follow standard IDOT rates, with preliminary design engineering accounting for 5% of the construction cost, and construction observation and material testing accounting for 6%.
The resolution passed smoothly via a unanimous roll call vote without debate.
Latest News Stories
Lincoln-Way 210 to Launch District Literacy Plan, Expands Community Partnerships
Meeting Summary and Briefs: Manhattan School District 114 Board of Education for September 17, 2025
Jackson Township Refers Manure-to-Gas Plant Proposal to Planning Commission
County Board Abates Over $25 Million in Property Taxes for Bond Payments
School Board Approves ‘Board Book Premier’ for Paperless Meetings
Lincoln-Way 210 Prepares for “Retirement Wave” with Focus on Recruitment
District 114 to Overhaul Policy Updates with New ‘Press Plus’ Service
Lincoln-Way Board Weighs Community Solar Program Promising $155,000 in Annual Savings
Will County Reverses Zoning on Peotone Farmland to Facilitate 10-Acre Sale
Meeting Summary and Briefs: Joliet Junior College Board of Trustees for September 10, 2025
Manhattan Park Board Hires New Architect for Round Barn Buildout, Secures Annexation for Future Banquet Hall
Lincoln-Way 210 Board Approves $172.7 Million Budget with Planned Deficit for Bus Purchases
Manhattan School District 114 Approves $41.5 Million Budget for FY26
Manhattan Fire District Advances New Station with $8.75M Bond Hearing, Approves Contracts with $194,000 Savings