—Photo by Glenn P. Knoblock

Forest Preserve District Advances Major Extensions and Repairs on Plum Creek Greenway Trail in Crete Township

Spread the love

Article Summary: The Forest Preserve District is currently undertaking dual construction projects on the Plum Creek Greenway Trail, initiating a massive 1.5-mile southern extension through Plum Valley Preserve and commencing repairs on an 80-foot bridge damaged by a fallen tree in Goodenow Grove Nature Preserve.

Plum Creek Greenway Trail Projects Key Points:

  • A new 1.5-mile trail extension will connect Plum Valley Preserve to Goodenow Grove Nature Preserve in Crete Township, with an estimated completion date of fall 2026.

  • The extension features the installation of 800 feet of elevated concrete boardwalks and a 150-foot bridge over Plum Creek, which will become the District’s largest single-span bridge.

  • Repairs began in early March on an 80-foot bridge in Goodenow Grove that was heavily damaged by a fallen tree in January 2025. Contractors are installing new footings, supports, and decking.

  • Future phases of the trail extension aim to connect the path north into Cook County and south to Beecher via the proposed Vincennes Trail.

  • The projects are locally funded by the Forest Preserve District’s Capital Improvement Program and a 2024–2028 grant from the Chicago Metropolitan Agency for Planning.

The Forest Preserve District announced in early March that dual construction projects are currently underway to expand and repair the Plum Creek Greenway Trail, promising significant upgrades for outdoor recreation in Crete Township and the surrounding Will County communities.

The most expansive of the two projects is a new 1.5-mile trail extension that will head south, winding through a hilly section of Plum Valley Preserve. The new multi-use trail will feature a 10-foot-wide path with 3-foot turf shoulders on each side. The extension will consist of a half-mile of crushed limestone, a half-mile of asphalt, and a half-mile street route.

The short street connection will be marked with explicit street signs and pavement directions, leading path users from the newly built trail section to an existing 3.15-mile leg of the Plum Creek Greenway Trail at Goodenow Grove Nature Preserve. The new construction is being added to an existing 1-mile crushed limestone segment that extends south from the Plum Valley Preserve entrance and dog park.

“Upon completion, the project will eliminate a gap in the existing trail system, resulting in a continuous greenway trail connection between Goodenow Grove Nature Preserve and the Plum Valley Preserve – Burville Road access,” said Colleen Novander, the Forest Preserve District’s director of planning and land preservation.

To navigate sensitive ecological areas, contractors are actively installing sections of a precast concrete pedestrian boardwalk to elevate the path. Crews will lay down one 600-foot section and another 200-foot section of boardwalk, utilizing massive concrete components that weigh 4,000 pounds each.

Additionally, concrete abutments are being poured and cured to support a new bridge spanning Plum Creek. Expected to be installed later in April, the 150-foot structure will be the largest single-span bridge in the District.

To minimize environmental impact to existing natural features like wetlands, ravines, and sensitive habitats, the engineering phase dictated that construction remain confined to a designated corridor with a maximum width of 100 feet.

The extension project, which carries an estimated completion date of fall 2026, is funded by the Forest Preserve District’s Capital Improvement Program. Supplemental funding support is provided through the Chicago Metropolitan Agency for Planning’s (CMAP) 2024–2028 Locally Programmed Transportation Alternatives Program (TAP-L).

Looking ahead, District officials noted that future phases of the trail will provide a critical north–south connection, eventually extending the path north into Cook County and south to the Village of Beecher via the proposed Vincennes Trail.

Goodenow Grove Bridge Repairs
While the extension moves forward, a separate set of contractors began repair work in early March on an existing bridge located in the eastern section of Goodenow Grove Nature Preserve, near East Bemes Road.

The 80-foot bridge, which sits just north of the preserve’s well-known “big bridge,” was significantly damaged in January 2025 when a large tree fell on the structure. Following the incident, the District consulted engineers to determine if the bridge required a total replacement or if it could be salvaged. Engineers ultimately concluded that the structure could be repaired.

Originally built in 2011 in tandem with the initial construction of the Plum Creek Greenway Trail and a capital redesign project at Goodenow Grove, the bridge requires extensive rehabilitation. Contractors are currently replacing one of the bridge’s main support structures and pouring new concrete footings. Additionally, all of the bridge’s decking and railings will be entirely replaced.

“It will look like a brand new bridge,” stated Chris Moeller, a Forest Preserve operations department supervisor.

The section of the Plum Creek Greenway Trail affected by the damage has been closed to the public since the tree fell in January. District officials anticipate the repairs will take several weeks to complete, noting that weather and other factors could impact the timeline. The trail segment will officially reopen once the reconstruction is finalized.

—Photo by Glenn P. Knoblock

Leave a Comment





Latest News Stories

Illinois’ ‘F’ grade leaves taxpayers on the hook for billions, watchdog says

Illinois’ ‘F’ grade leaves taxpayers on the hook for billions, watchdog says

By Catrina Barker | The Center Square contributorThe Center Square (The Center Square) – Budget gimmicks, pension debt and late financial reports are leaving Illinois taxpayers in the dark, according...
Illinois quick hits: Chicago Jewish Alliance on peace developments; Blue Ribbon Schools announced

Illinois quick hits: Chicago Jewish Alliance on peace developments; Blue Ribbon Schools announced

By Jim Talamonti | The Center SquareThe Center Square Chicago Jewish Alliance on peace developments The Chicago Jewish Alliance has offered a response to the release of 20 hostages held...
WATCH: Trump’s emergency Guard appeal denied; Fiscal Fallout reviews state salaries

WATCH: Trump’s emergency Guard appeal denied; Fiscal Fallout reviews state salaries

By Greg Bishop | The Center SquareThe Center Square (The Center Square) – In today's edition of Illinois in Focus Daily, The Center Square Editor Greg Bishop gets to the...
Reforms prompt big money appeals in IL biometrics cases

Reforms prompt big money appeals in IL biometrics cases

By Jonathan Bilyk | Legal NewslineThe Center Square Even as reforms seem to have edged down the number of biometric privacy lawsuits targeted at businesses in Illinois, appeals courts are...
Meeting Briefs

Meeting Summary and Briefs: Will County Board Executive Committee for October 9, 2025

The Will County Board’s Executive Committee held a contentious meeting on Thursday, October 9, 2025, dominated by debates over public access and a controversial resolution concerning immigrant rights. A proposal...
Screenshot 2025-10-10 at 11.36.53 AM

Renovations at Veterans Assistance Commission and Court Annex on Track for Winter Completion

Will County Capital Improvements & IT Committee Meeting October 7, 2025 Article Summary: Will County's new Veterans Assistance Commission facility in Joliet is projected to be completed by December, while...
Screenshot 2025-10-10 at 11.20.34 AM

Will County Considers First Update to Wastewater Ordinance Since 2016

Will County Public Health & Safety Committee Meeting October 2, 2025 Article Summary: Will County is preparing to update its ordinance governing private wastewater systems, with proposed changes including the...
Screenshot 2025-10-10 at 12.12.11 PM

IDOT Plans to Invest Over $1.3 Billion in Will County Roads Through 2031

Will County Public Works & Transportation Committee Meeting October 7, 2025 Article Summary: The Illinois Department of Transportation (IDOT) has allocated over $1.3 billion for road and bridge projects in...
Screenshot 2025-10-10 at 11.39.54 AM

Committee Advances 50% Increase in Mental Health Levy on 4-3 Vote

Will County Finance Committee Meeting October 7, 2025 Article Summary: The Will County Finance Committee on Tuesday narrowly approved a proposed $12 million levy for the Community Mental Health Board,...
Screenshot 2025-10-10 at 11.19.48 AM

Will County Poised to Launch Major Mental Health Initiative Based on Joliet Program’s Success

Will County Public Health & Safety Committee Meeting October 2, 2025 Article Summary: The Will County Board Public Health & Safety Committee on Thursday considered establishing "Will County CARES," a...
Screenshot 2025-10-10 at 12.05.35 PM

Looming State Energy Bill Threatens to Further Limit County Control Over Solar and Wind Projects

Will County Legislative Committee Meeting October 7, 2025 Article Summary: A state energy bill likely to be considered during the fall veto session or next spring could further strip Will...
Screenshot 2025-10-10 at 11.52.31 AM

Controversial Immigrant Rights Resolution Postponed by Will County Board After Heated Debate

Will County Executive Committee Meeting October 9, 2025 Article Summary: The Will County Executive Committee voted to indefinitely postpone a contentious resolution titled "Declaring Will County's Commitment to Ensure Communities...
Screenshot 2025-10-10 at 11.39.50 AM

Will County’s Gas-to-Energy Plant Reports Nearly $460,000 Net Loss Amid Operational Setbacks

Will County Finance Committee Meeting October 7, 2025 Article Summary: Will County's Renewable Natural Gas (RNG) plant at the county landfill posted a net loss of nearly $460,000 for the...
Screenshot 2025-10-10 at 11.36.47 AM

Will County to Draft First-Ever Policy on Artificial Intelligence Use

Will County Capital Improvements & IT Committee Meeting October 7, 2025 Article Summary: The Will County Board's Capital Improvements & IT Committee has initiated the process of drafting a comprehensive...
Screenshot 2025-10-10 at 11.20.18 AM

Will County Sees 50% Drop in Opioid Deaths, But Alarming Rise in Suicides

Will County Public Health & Safety Committee Meeting October 2, 2025 Article Summary: Will County is experiencing a dramatic 50% reduction in opioid overdose deaths compared to last year, a...