—Photo by Glenn P. Knoblock

Forest Preserve District Advances Major Extensions and Repairs on Plum Creek Greenway Trail in Crete Township

Spread the love

Article Summary: The Forest Preserve District is currently undertaking dual construction projects on the Plum Creek Greenway Trail, initiating a massive 1.5-mile southern extension through Plum Valley Preserve and commencing repairs on an 80-foot bridge damaged by a fallen tree in Goodenow Grove Nature Preserve.

Plum Creek Greenway Trail Projects Key Points:

  • A new 1.5-mile trail extension will connect Plum Valley Preserve to Goodenow Grove Nature Preserve in Crete Township, with an estimated completion date of fall 2026.

  • The extension features the installation of 800 feet of elevated concrete boardwalks and a 150-foot bridge over Plum Creek, which will become the District’s largest single-span bridge.

  • Repairs began in early March on an 80-foot bridge in Goodenow Grove that was heavily damaged by a fallen tree in January 2025. Contractors are installing new footings, supports, and decking.

  • Future phases of the trail extension aim to connect the path north into Cook County and south to Beecher via the proposed Vincennes Trail.

  • The projects are locally funded by the Forest Preserve District’s Capital Improvement Program and a 2024–2028 grant from the Chicago Metropolitan Agency for Planning.

The Forest Preserve District announced in early March that dual construction projects are currently underway to expand and repair the Plum Creek Greenway Trail, promising significant upgrades for outdoor recreation in Crete Township and the surrounding Will County communities.

The most expansive of the two projects is a new 1.5-mile trail extension that will head south, winding through a hilly section of Plum Valley Preserve. The new multi-use trail will feature a 10-foot-wide path with 3-foot turf shoulders on each side. The extension will consist of a half-mile of crushed limestone, a half-mile of asphalt, and a half-mile street route.

The short street connection will be marked with explicit street signs and pavement directions, leading path users from the newly built trail section to an existing 3.15-mile leg of the Plum Creek Greenway Trail at Goodenow Grove Nature Preserve. The new construction is being added to an existing 1-mile crushed limestone segment that extends south from the Plum Valley Preserve entrance and dog park.

“Upon completion, the project will eliminate a gap in the existing trail system, resulting in a continuous greenway trail connection between Goodenow Grove Nature Preserve and the Plum Valley Preserve – Burville Road access,” said Colleen Novander, the Forest Preserve District’s director of planning and land preservation.

To navigate sensitive ecological areas, contractors are actively installing sections of a precast concrete pedestrian boardwalk to elevate the path. Crews will lay down one 600-foot section and another 200-foot section of boardwalk, utilizing massive concrete components that weigh 4,000 pounds each.

Additionally, concrete abutments are being poured and cured to support a new bridge spanning Plum Creek. Expected to be installed later in April, the 150-foot structure will be the largest single-span bridge in the District.

To minimize environmental impact to existing natural features like wetlands, ravines, and sensitive habitats, the engineering phase dictated that construction remain confined to a designated corridor with a maximum width of 100 feet.

The extension project, which carries an estimated completion date of fall 2026, is funded by the Forest Preserve District’s Capital Improvement Program. Supplemental funding support is provided through the Chicago Metropolitan Agency for Planning’s (CMAP) 2024–2028 Locally Programmed Transportation Alternatives Program (TAP-L).

Looking ahead, District officials noted that future phases of the trail will provide a critical north–south connection, eventually extending the path north into Cook County and south to the Village of Beecher via the proposed Vincennes Trail.

Goodenow Grove Bridge Repairs
While the extension moves forward, a separate set of contractors began repair work in early March on an existing bridge located in the eastern section of Goodenow Grove Nature Preserve, near East Bemes Road.

The 80-foot bridge, which sits just north of the preserve’s well-known “big bridge,” was significantly damaged in January 2025 when a large tree fell on the structure. Following the incident, the District consulted engineers to determine if the bridge required a total replacement or if it could be salvaged. Engineers ultimately concluded that the structure could be repaired.

Originally built in 2011 in tandem with the initial construction of the Plum Creek Greenway Trail and a capital redesign project at Goodenow Grove, the bridge requires extensive rehabilitation. Contractors are currently replacing one of the bridge’s main support structures and pouring new concrete footings. Additionally, all of the bridge’s decking and railings will be entirely replaced.

“It will look like a brand new bridge,” stated Chris Moeller, a Forest Preserve operations department supervisor.

The section of the Plum Creek Greenway Trail affected by the damage has been closed to the public since the tree fell in January. District officials anticipate the repairs will take several weeks to complete, noting that weather and other factors could impact the timeline. The trail segment will officially reopen once the reconstruction is finalized.

—Photo by Glenn P. Knoblock

Leave a Comment





Latest News Stories

Will County Board Graphic.01

Health & Safety Committee: Opioid Overdose Deaths Drop to Zero in January as Behavioral Health Department Expands Role

Public Health & Safety Committee Meeting | February 5, 2026 Article Summary: The Will County Health Department reported a significant decline in opioid overdose deaths, recording zero fatalities in January...
Joliet Junior College Graphic.5

State of the College: JJC Announces Plans for New Campus in Grundy County

Joliet Junior College State of the College | February 4, 2026 Article Summary: During his State of the College address, Joliet Junior College (JJC) President Dr. Clyne Namuo announced the...
Meeting Briefs

Meeting Summary and Briefs: Manhattan Village Board for Feb. 3, 2026

Manhattan Village Board Meeting | Feb. 3, 2026 The Manhattan Village Board met on Tuesday, February 3, 2026, with all trustees present, including Trustees Jennifer Bahena, Justin Young, Robert Dilling,...
Meeting Briefs

Meeting Summary and Briefs: Public Works & Transportation Committee for February 3, 2026

Public Works & Transportation Committee Meeting | February 3, 2026 The Will County Public Works and Transportation Committee met on Tuesday, February 3, 2026, to approve various infrastructure investments and...
Will County Board Graphic.03

Health & Safety Committee: District 3 Board Member Pushes for Expanded Animal Control Services in Monee, Crete

Public Health & Safety Committee Meeting | February 5, 2026 Article Summary: Will County Board Member Daniel J. Butler (District 3) urged Animal Protection Services to establish intergovernmental agreements with...
Meeting Briefs

Meeting Summary and Briefs: Will County Capital Improvements & IT Committee for Jan. 6, 2026

Will County Capital Improvements & IT Committee Meeting | Jan. 6, 2026 The Will County Board Capital Improvements and IT Committee met Tuesday, Jan. 6, 2026, to discuss the county's...
Will County Board Graphic.04

Legislative Committee: Lobbyists Report on Federal Shutdown and Legislative Outlook

Legislative Committee Meeting | February 3, 2026 Article Summary: Federal lobbyists provided the Legislative Committee with an update on the partial government shutdown and the status of appropriations bills. While...
Will County Finance Logo

County Authorizes Financial Study of Homer Glen Law Enforcement Contract

Finance Committee Meeting | February 3, 2026 Article Summary: The Finance Committee voted to authorize a professional study to evaluate the true cost of providing law enforcement services to the...
Meeting Briefs

Meeting Summary and Briefs: Joliet Junior College Board of Trustees Workshop for January 28, 2026

JJC Trustees Workshop Meeting | January 28, 2026 The Joliet Junior College Board of Trustees convened for a workshop session on Wednesday to discuss the institution's long-term financial health and...
Screenshot 2026-02-05 at 2.20.35 PM

IDOT Implementing Speed Limit Changes in Manhattan

Manhattan Village Board Meeting | Feb. 3, 2026 Article Summary: Mayor Mike Adrieansen announced that the Illinois Department of Transportation (IDOT) is finalizing speed limit adjustments on key village thoroughfares....
Will County Board Graphic.01

Will County Public Works Debates Future Bridge Needs as 159th Street Closure Looms

Public Works & Transportation Committee Meeting | February 3, 2026 Article Summary: A discussion regarding the future deck repair of the 159th Street bridge in Lockport sparked a debate about...
Will County Board Graphic.02

Capital Imp Committee: Veterans Assistance Commission Set to Move into New Facility

Will County Capital Improvements & IT Committee Meeting | Jan. 6, 2026 Article Summary: The Will County Veterans Assistance Commission (VAC) is scheduled to move into its new headquarters at...
will county board meeting.6

Capital Imp Committee: Health Dept Elevator Repair Costs Significantly Lower Than Estimates

Will County Capital Improvements & IT Committee Meeting | Jan. 6, 2026 Article Summary: A malfunctioning elevator at the Will County Health Department has been repaired for approximately $18,000 to...
will county board graphic

Legislative Committee Adopts 2026 Federal Legislative Agenda

Legislative Committee Meeting | February 3, 2026 Article Summary: The Will County Legislative Committee finalized and approved the 2026 Federal Legislative Agenda, outlining the county's top priorities for Congress. The...
Meeting Briefs

Meeting Summary and Briefs: Jackson Township Board for December 10, 2025

Jackson Township Board Meeting | December 10, 2025 The Jackson Township Board met on Wednesday, December 10, 2025, to handle end-of-year financial business and hear reports from township officials. The...