—Photo by Glenn P. Knoblock

Forest Preserve District Advances Major Extensions and Repairs on Plum Creek Greenway Trail in Crete Township

Spread the love

Article Summary: The Forest Preserve District is currently undertaking dual construction projects on the Plum Creek Greenway Trail, initiating a massive 1.5-mile southern extension through Plum Valley Preserve and commencing repairs on an 80-foot bridge damaged by a fallen tree in Goodenow Grove Nature Preserve.

Plum Creek Greenway Trail Projects Key Points:

  • A new 1.5-mile trail extension will connect Plum Valley Preserve to Goodenow Grove Nature Preserve in Crete Township, with an estimated completion date of fall 2026.

  • The extension features the installation of 800 feet of elevated concrete boardwalks and a 150-foot bridge over Plum Creek, which will become the District’s largest single-span bridge.

  • Repairs began in early March on an 80-foot bridge in Goodenow Grove that was heavily damaged by a fallen tree in January 2025. Contractors are installing new footings, supports, and decking.

  • Future phases of the trail extension aim to connect the path north into Cook County and south to Beecher via the proposed Vincennes Trail.

  • The projects are locally funded by the Forest Preserve District’s Capital Improvement Program and a 2024–2028 grant from the Chicago Metropolitan Agency for Planning.

The Forest Preserve District announced in early March that dual construction projects are currently underway to expand and repair the Plum Creek Greenway Trail, promising significant upgrades for outdoor recreation in Crete Township and the surrounding Will County communities.

The most expansive of the two projects is a new 1.5-mile trail extension that will head south, winding through a hilly section of Plum Valley Preserve. The new multi-use trail will feature a 10-foot-wide path with 3-foot turf shoulders on each side. The extension will consist of a half-mile of crushed limestone, a half-mile of asphalt, and a half-mile street route.

The short street connection will be marked with explicit street signs and pavement directions, leading path users from the newly built trail section to an existing 3.15-mile leg of the Plum Creek Greenway Trail at Goodenow Grove Nature Preserve. The new construction is being added to an existing 1-mile crushed limestone segment that extends south from the Plum Valley Preserve entrance and dog park.

“Upon completion, the project will eliminate a gap in the existing trail system, resulting in a continuous greenway trail connection between Goodenow Grove Nature Preserve and the Plum Valley Preserve – Burville Road access,” said Colleen Novander, the Forest Preserve District’s director of planning and land preservation.

To navigate sensitive ecological areas, contractors are actively installing sections of a precast concrete pedestrian boardwalk to elevate the path. Crews will lay down one 600-foot section and another 200-foot section of boardwalk, utilizing massive concrete components that weigh 4,000 pounds each.

Additionally, concrete abutments are being poured and cured to support a new bridge spanning Plum Creek. Expected to be installed later in April, the 150-foot structure will be the largest single-span bridge in the District.

To minimize environmental impact to existing natural features like wetlands, ravines, and sensitive habitats, the engineering phase dictated that construction remain confined to a designated corridor with a maximum width of 100 feet.

The extension project, which carries an estimated completion date of fall 2026, is funded by the Forest Preserve District’s Capital Improvement Program. Supplemental funding support is provided through the Chicago Metropolitan Agency for Planning’s (CMAP) 2024–2028 Locally Programmed Transportation Alternatives Program (TAP-L).

Looking ahead, District officials noted that future phases of the trail will provide a critical north–south connection, eventually extending the path north into Cook County and south to the Village of Beecher via the proposed Vincennes Trail.

Goodenow Grove Bridge Repairs
While the extension moves forward, a separate set of contractors began repair work in early March on an existing bridge located in the eastern section of Goodenow Grove Nature Preserve, near East Bemes Road.

The 80-foot bridge, which sits just north of the preserve’s well-known “big bridge,” was significantly damaged in January 2025 when a large tree fell on the structure. Following the incident, the District consulted engineers to determine if the bridge required a total replacement or if it could be salvaged. Engineers ultimately concluded that the structure could be repaired.

Originally built in 2011 in tandem with the initial construction of the Plum Creek Greenway Trail and a capital redesign project at Goodenow Grove, the bridge requires extensive rehabilitation. Contractors are currently replacing one of the bridge’s main support structures and pouring new concrete footings. Additionally, all of the bridge’s decking and railings will be entirely replaced.

“It will look like a brand new bridge,” stated Chris Moeller, a Forest Preserve operations department supervisor.

The section of the Plum Creek Greenway Trail affected by the damage has been closed to the public since the tree fell in January. District officials anticipate the repairs will take several weeks to complete, noting that weather and other factors could impact the timeline. The trail segment will officially reopen once the reconstruction is finalized.

—Photo by Glenn P. Knoblock

Leave a Comment





Latest News Stories

Jackson Township Graphic.1 NEW

Jackson Township Prepares for Property Viability Pole Relocation, Addresses Northpoint Traffic Control

Jackson Township Board Meeting | January 14, 2026 Article Summary: The Jackson Township Board of Trustees discussed upcoming infrastructure and traffic management efforts, including potential compensation for moving a utility...
Screenshot 2026-03-22 at 12.12.19 PM

Manhattan School District Explores Alternative Transportation Amid Lincoln-Way Bus Challenges

Manhattan School District 114 Meeting | February 11, 2026 Article Summary: The Manhattan School District 114 Board of Education is officially preparing to explore alternative busing options by issuing a...

Manhattan Ranked 6th Safest City in Illinois; Police Chief Warns of Traffic Accidents

Village of Manhattan Board Meeting | February 17, 2026 Article Summary: Mayor Mike Adrieansen announced that Manhattan has been ranked the 6th safest city in Illinois by SafeWise. Despite the...
Manhattan Township

Manhattan Township Assessor Initiates $13,500 Software Upgrade Amid Office Transition

Manhattan Township Meeting | January 13, 2026 Article Summary: Newly installed Manhattan Township Assessor Kristen Blaser announced the procurement of a modernized property assessment software system to overhaul the office's valuation...

Manhattan and New Lenox Renew Boundary Agreement Through 2046

Village of Manhattan Board Meeting | February 17, 2026 Article Summary: Following a public hearing, the Manhattan Village Board approved a new intergovernmental jurisdictional boundary line agreement with the Village...
Screenshot 2026-02-18 at 2.53.56 PM

Manhattan Board Approves Route 52 Safety Study and Multi-Use Path Engineering

Village of Manhattan Board Meeting | February 17, 2026 Article Summary: The Village of Manhattan Board of Trustees approved two separate resolutions regarding U.S. Route 52, authorizing a safety action...
Screenshot 2026-02-04 at 2.03.49 PM

State of the College: Local Legislators Bolster Student Support Services

Joliet Junior College State of the College | February 4, 2026 Article Summary: Joliet Junior College recognized state legislators for their direct support of the Wolves Essential Pantry, which aids...
Meeting Briefs

Meeting Summary and Briefs: Public Health & Safety Committee for February 5, 2026

Public Health & Safety Committee Meeting | February 5, 2026 Meeting SummaryThe Will County Board Public Health & Safety Committee met on Tuesday, February 5, 2026, to review departmental reports...
Joliet Junior College Graphic.5

State of the College: Dual Credit Program Enrollment Hits 6,000 Students

Joliet Junior College State of the College | February 4, 2026 Article Summary: The "12x12x12" dual credit initiative has driven a surge in high school participation, with nearly half of...
Will County Finance Logo

Meeting Summary and Briefs: Finance Committee for February 3, 2026

Finance Committee Meeting | February 3, 2026 The Will County Finance Committee met on Tuesday, February 3, 2026, to address critical facility needs and review the county's financial standing. The...
Will County P&Z Logo Planning Zoning

Fairmont Neighborhood Plan Update Prioritizes Infrastructure and Beautification Following Demographic Shift

Planning and Zoning Commission Meeting | February 3, 2026 Article Summary: The Will County Planning and Zoning Commission unanimously approved an update to the Fairmont Neighborhood Plan, addressing significant demographic...
Will County Board Graphic.04

Health & Safety Committee: Monee Church Kitchen Project Highlighted in County Health Impact Report

Public Health & Safety Committee Meeting | February 5, 2026 Article Summary: The Will County MAPP Collaborative presented its impact report, highlighting ARPA-funded community kitchen projects in Monee and Joliet...
Screenshot 2026-02-04 at 2.03.49 PM

State of the College: President Namuo Pushes for Bachelor’s Degrees, Cites Record Graduation Rates

Joliet Junior College State of the College | February 4, 2026 Article Summary: JJC President Dr. Clyne Namuo highlighted the college’s legislative push to offer bachelor's degrees in applied fields...
Will County Finance Logo

Emergency Freezer Replacement Approved for Adult Detention Facility

Finance Committee Meeting | February 3, 2026 Article Summary: The committee authorized an emergency expenditure of $155,000 to replace a failed walk-in freezer system at the Adult Detention Facility (ADF)....
Will County Board Graphic.01

Meeting Summary and Briefs: Legislative Committee for February 3, 2026

Legislative Committee Meeting | February 3, 2026 The Will County Legislative Committee convened on Tuesday, February 3, 2026, to finalize its federal priorities and receive updates on state and national...